Horizontal Capacity Coordination for Risk Management and Flexibility: Pay Ex Ante or Commit a Fraction of Ex Post Demand?

Motivated by the dual-sourcing and contracting practices in the semiconductor industry, we study two prevailing types of contracts that deal with horizontal-capacity-coordination issues between two possible sources: an integrated device manufacturer IDM and a foundry. IDMs both design and manufacture semiconductor devices, whereas foundries concentrate only on manufacturing. Because production capacity is capital intensive, IDMs often make decisions on whether to manufacture each device internally or subcontract to foundries. Two types of contracts are most frequently used in such settings. Under α-contracts, a fixed fraction α of ex post realized demand is committed to subcontract to the foundry and serves as an incentive for the foundry to build capacity. Under reservation contracts, an ex ante capacity reservation fee is paid to the foundry as an incentive to build capacity. Because of the different nature of incentives under these contracts, it is unclear which type of contract maximizes the IDM's expected profit. Furthermore, IDMs and their customers often prefer dual sourcing to sole sourcing for risk-management purposes. This paper studies the relationship between the two types of contracts, both with and without dual-sourcing constraints and shows the effect of a dual-sourcing preference on contract selection. Our analysis offers supporting rationale for the coexistence of α-contracts and reservation contracts in practice and provides insights on horizontal capacity coordination beyond the semiconductor industry.

[1]  Asoo J. Vakharia,et al.  Single versus multiple supplier sourcing strategies , 2007, Eur. J. Oper. Res..

[2]  William S. Lovejoy,et al.  Quantity Flexibility Contracts and Supply Chain Performance , 1999, Manuf. Serv. Oper. Manag..

[3]  Robert M. Fuhrer,et al.  Coordinating Investment, Production, and Subcontracting , 1999 .

[4]  Panagiotis Kouvelis,et al.  Horizontal Coordinating Contracts in the Semiconductor Industry , 2014, Eur. J. Oper. Res..

[5]  Mark D. Treleven,et al.  A risk/benefit analysis of sourcing strategies: Single vs. multiple sourcing , 1988 .

[6]  S. D. Wu,et al.  Managing High-Tech Capacity Expansion via Reservation Contracts , 2009 .

[7]  Izak Duenyas,et al.  Quantity commitment, production and subcontracting with bargaining , 2009 .

[8]  T. Bashyam,et al.  Competitive capacity expansion under demand uncertainty , 1996 .

[9]  Laurens G. Debo,et al.  Second Sourcing vs. Sole Sourcing with Capacity Investment and Asymmetric Information , 2009, Manuf. Serv. Oper. Manag..

[10]  Gérard P. Cachon,et al.  Capacity Choice and Allocation: Strategic Behavior and Supply Chain Performance , 1999 .

[11]  Kevin F. McCardle,et al.  The Competitive Newsboy , 1997, Oper. Res..

[12]  Özalp Özer,et al.  Strategic Commitments for an Optimal Capacity Decision Under Asymmetric Forecast Information , 2006, Manag. Sci..

[13]  Yehuda Bassok,et al.  Analysis of supply contracts with commitments and flexibility , 2008 .

[14]  A. Tsay The Quantity Flexibility Contract and Supplier-Customer Incentives , 1999 .

[15]  S. D. Wu,et al.  Managing Capacity in the High-Tech Industry: A Review of Literature , 2005 .

[16]  Jan A. Van Mieghem,et al.  Commissioned Paper: Capacity Management, Investment, and Hedging: Review and Recent Developments , 2003, Manuf. Serv. Oper. Manag..

[17]  Erica L. Plambeck,et al.  Sell the Plant? The Impact of Contract Manufacturing on Innovation, Capacity, and Profitability , 2005, Manag. Sci..

[18]  Erica L. Plambeck,et al.  The Impact of Duplicate Orders on Demand Estimation and Capacity Investment , 2003, Manag. Sci..

[19]  S. David Wu,et al.  Capacity reservation contracts for high-tech industry , 2007, Eur. J. Oper. Res..