Identification and prioritization of effective factors in assessment and ranking of contractors using fuzzy multi-criteria techniques

Article history: Received June 25, 2015 Received in revised format: June 28, 2015 Accepted July 31, 2015 Available online August 6 2015 In the recent years, issues like high competitive pressure, globalization, business difficulties, resources limits, technological complications and activities specialization, fast changes in environment, etc. have caused organizations to reconsider their management methods. As a result, they are looking forward to branding new strategies in order to achieve competitive advantages. Focusing on main competences and outsourcing most of the activities are some of these strategies. Assessment management and selecting the appropriate contractor who holds adequate efficiency is of critical importance for having a project accomplished in time and with foreseen resources. Various qualitative and quantitative factors of different importance are involved in contractors’ assessment and should be taken into account before decision making. In this paper, once the factors are identified using fuzzy screening method, they are prioritized according to their importance by means of fuzzy hierarchical analysis. Growing Science Ltd. All rights reserved. 6 © 201

[1]  R. Yager Families of OWA operators , 1993 .

[2]  Jao-Hong Cheng,et al.  An application of fuzzy Delphi and fuzzy AHP on evaluating wafer supplier in semiconductor industry , 2009 .

[3]  G. Munda Multicriteria Evaluation in a Fuzzy Environment: Theory and Applications in Ecological Economics , 1995 .

[4]  T. Ross Fuzzy Logic with Engineering Applications , 1994 .

[5]  Yawei Li,et al.  Fuzzy Approach to Prequalifying Construction Contractors , 2007 .

[6]  Khaled Nassar,et al.  Fuzzy clustering validity for contractor performance evaluation: Application to UAE contractors , 2013 .

[7]  Walter J.M. Kickert,et al.  Fuzzy Theories on Decision Making: A Critical Review , 1979 .

[8]  Lotfi A. Zadeh,et al.  The Concepts of a Linguistic Variable and its Application to Approximate Reasoning , 1975 .

[9]  Irem Dikmen,et al.  Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES) , 2008 .

[10]  David Eaton,et al.  Contractor pre-qualification model: State-of-the-art , 2007 .

[11]  João Paulo Davim,et al.  A decision-making framework model for material selection using a combined multiple attribute decision-making method , 2008 .

[12]  Victor B. Kreng,et al.  The application of Fuzzy Delphi Method and Fuzzy AHP in lubricant regenerative technology selection , 2010, Expert Syst. Appl..

[13]  Abraham Charnes,et al.  A developmental study of data envelopment analysis in measuring the efficiency of maintenance units in the U.S. air forces , 1984, Ann. Oper. Res..

[14]  Ana Nieto-Morote,et al.  A fuzzy multi-criteria decision making model for construction contractor prequalification , 2012 .

[15]  Robert L. K. Tiong,et al.  A Fuzzy Decision Framework for Contractor Selection , 2005 .

[16]  W. C. Benton,et al.  Vendor selection criteria and methods , 1991 .

[17]  Wan Lung Ng,et al.  An efficient and simple model for multiple criteria supplier selection problem , 2008, European Journal of Operational Research.

[18]  Edyta Plebankiewicz,et al.  Contractor prequalification model using fuzzy sets , 2010 .

[19]  J. Buckley,et al.  Fuzzy hierarchical analysis , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).