The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects

This research was partially supported by the FAPA program of Universidad de Los Andes, Colombia (code P14.246922.005/01). The authors would also like to thank the research group of Construction Engineering and Management (INgeco) at Universidad de los Andes.

[1]  Gunnar Lucko,et al.  Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions , 2016 .

[2]  Nart Sooksil,et al.  Precedence relationship options for the resource levelling problem using a genetic algorithm , 2015 .

[3]  Jae-Jun Kim,et al.  Enhanced Resource Leveling Technique for Project Scheduling , 2005 .

[4]  Konstantinos P. Anagnostopoulos,et al.  A simulated annealing hyperheuristic for construction resource levelling , 2010 .

[5]  Sou-Sen Leu,et al.  OPTIMAL REPETITIVE SCHEDULING MODEL WITH SHAREABLE RESOURCE CONSTRAINT , 2001 .

[6]  Tarek Hegazy Computerized System for Efficient Delivery of Infrastructure Maintenance/Repair Programs , 2006 .

[7]  Gunnar Lucko,et al.  Comparison and Renaissance of Classic Line-of-balance and Linear Schedule Concepts for Construction Industry☆ , 2015 .

[8]  G. K. Koulinas,et al.  A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities , 2013 .

[9]  Robert B. Harris Packing Method for Resource Leveling (PACK) , 1990 .

[10]  Shu-Shun Liu,et al.  Optimizing linear project scheduling with multi-skilled crews , 2012 .

[11]  Chun-Yen Huang,et al.  Resource-constrained scheduling for continuous repetitive projects with time-based production units , 2009 .

[12]  Klaus Neumann,et al.  Resource levelling for projects with schedule-dependent time windows , 1999, Eur. J. Oper. Res..

[13]  Víctor Yepes,et al.  The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm , 2013 .

[14]  Erik Demeulemeester,et al.  Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..

[15]  Ajith Abraham,et al.  An Improved Harmony Search Algorithm with Differential Mutation Operator , 2009, Fundam. Informaticae.

[16]  José Luis Ponz-Tienda,et al.  The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations , 2015, Comput. Aided Civ. Infrastructure Eng..

[17]  Gündüz Ulusoy,et al.  A survey on the resource-constrained project scheduling problem , 1995 .

[18]  Hojjat Adeli,et al.  Scheduling/Cost Optimization and Neural Dynamics Model for Construction , 1997 .

[19]  Eugenio Pellicer,et al.  A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags , 2017, Comput. Aided Civ. Infrastructure Eng..

[20]  Andrés L. Medaglia,et al.  Sustainable workforce scheduling in construction program management , 2013, J. Oper. Res. Soc..

[21]  Hojjat Adeli,et al.  Resource Scheduling Using Neural Dynamics Model of Adeli and Park , 2001 .

[22]  Onur Behzat Tokdemir,et al.  CHALLENGES IN LINE-OF-BALANCE SCHEDULING , 2002 .

[23]  Rema Padman,et al.  An integrated survey of deterministic project scheduling , 2001 .

[24]  Khaled A El-Rayes,et al.  Optimizing Resource Leveling in Construction Projects , 2009 .

[25]  Futian Wang,et al.  Scheduling Optimization of Linear Schedule with Constraint Programming , 2018, Comput. Aided Civ. Infrastructure Eng..

[26]  Alan D. Russell,et al.  Extensions to Linear Scheduling Optimization , 1988 .

[27]  Tarek Hegazy,et al.  Efficient Repetitive Scheduling for High-Rise Construction , 2008 .

[28]  S. Selcuk Erenguc,et al.  Project Scheduling Problems: A Survey , 1993 .

[29]  Khaled A El-Rayes,et al.  Optimizing Resource Utilization for Repetitive Construction Projects , 2001 .

[30]  José Luis Ponz-Tienda,et al.  Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags , 2017 .

[31]  Philip M. Wolfe,et al.  Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .

[32]  Professor Dr. Klaus Neumann,et al.  Project Scheduling with Time Windows and Scarce Resources , 2003, Springer Berlin Heidelberg.

[33]  Piotr Jaśkowski,et al.  Scheduling Linear Construction Projects with Constraints on Resource Availability , 2017 .

[34]  Willy Herroelen,et al.  Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..

[35]  Shlomo Selinger Construction Planning for Linear Projects , 1980 .