The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
暂无分享,去创建一个
Eugenio Pellicer | José Luis Ponz-Tienda | J. D. García-Nieves | A. Salcedo-Bernal | E. Pellicer | J. Ponz-Tienda | A. Salcedo-Bernal
[1] Gunnar Lucko,et al. Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions , 2016 .
[2] Nart Sooksil,et al. Precedence relationship options for the resource levelling problem using a genetic algorithm , 2015 .
[3] Jae-Jun Kim,et al. Enhanced Resource Leveling Technique for Project Scheduling , 2005 .
[4] Konstantinos P. Anagnostopoulos,et al. A simulated annealing hyperheuristic for construction resource levelling , 2010 .
[5] Sou-Sen Leu,et al. OPTIMAL REPETITIVE SCHEDULING MODEL WITH SHAREABLE RESOURCE CONSTRAINT , 2001 .
[6] Tarek Hegazy. Computerized System for Efficient Delivery of Infrastructure Maintenance/Repair Programs , 2006 .
[7] Gunnar Lucko,et al. Comparison and Renaissance of Classic Line-of-balance and Linear Schedule Concepts for Construction Industry☆ , 2015 .
[8] G. K. Koulinas,et al. A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities , 2013 .
[9] Robert B. Harris. Packing Method for Resource Leveling (PACK) , 1990 .
[10] Shu-Shun Liu,et al. Optimizing linear project scheduling with multi-skilled crews , 2012 .
[11] Chun-Yen Huang,et al. Resource-constrained scheduling for continuous repetitive projects with time-based production units , 2009 .
[12] Klaus Neumann,et al. Resource levelling for projects with schedule-dependent time windows , 1999, Eur. J. Oper. Res..
[13] Víctor Yepes,et al. The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm , 2013 .
[14] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..
[15] Ajith Abraham,et al. An Improved Harmony Search Algorithm with Differential Mutation Operator , 2009, Fundam. Informaticae.
[16] José Luis Ponz-Tienda,et al. The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations , 2015, Comput. Aided Civ. Infrastructure Eng..
[17] Gündüz Ulusoy,et al. A survey on the resource-constrained project scheduling problem , 1995 .
[18] Hojjat Adeli,et al. Scheduling/Cost Optimization and Neural Dynamics Model for Construction , 1997 .
[19] Eugenio Pellicer,et al. A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags , 2017, Comput. Aided Civ. Infrastructure Eng..
[20] Andrés L. Medaglia,et al. Sustainable workforce scheduling in construction program management , 2013, J. Oper. Res. Soc..
[21] Hojjat Adeli,et al. Resource Scheduling Using Neural Dynamics Model of Adeli and Park , 2001 .
[22] Onur Behzat Tokdemir,et al. CHALLENGES IN LINE-OF-BALANCE SCHEDULING , 2002 .
[23] Rema Padman,et al. An integrated survey of deterministic project scheduling , 2001 .
[24] Khaled A El-Rayes,et al. Optimizing Resource Leveling in Construction Projects , 2009 .
[25] Futian Wang,et al. Scheduling Optimization of Linear Schedule with Constraint Programming , 2018, Comput. Aided Civ. Infrastructure Eng..
[26] Alan D. Russell,et al. Extensions to Linear Scheduling Optimization , 1988 .
[27] Tarek Hegazy,et al. Efficient Repetitive Scheduling for High-Rise Construction , 2008 .
[28] S. Selcuk Erenguc,et al. Project Scheduling Problems: A Survey , 1993 .
[29] Khaled A El-Rayes,et al. Optimizing Resource Utilization for Repetitive Construction Projects , 2001 .
[30] José Luis Ponz-Tienda,et al. Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags , 2017 .
[31] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[32] Professor Dr. Klaus Neumann,et al. Project Scheduling with Time Windows and Scarce Resources , 2003, Springer Berlin Heidelberg.
[33] Piotr Jaśkowski,et al. Scheduling Linear Construction Projects with Constraints on Resource Availability , 2017 .
[34] Willy Herroelen,et al. Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..
[35] Shlomo Selinger. Construction Planning for Linear Projects , 1980 .