Lot Scheduling in a Two-Machine Cell with Swapping Devices
暂无分享,去创建一个
[1] Toshihide Ibaraki,et al. Automated Two-machine Flowshop Scheduling: A Solvable Case , 1991 .
[2] Christos H. Papadimitriou,et al. Flowshop scheduling with limited temporary storage , 1980, JACM.
[3] Joseph Talavage. Flexible Manufacturing Systems in Practice , 1987 .
[4] R. P. Davis,et al. Flexible manufacturing systems: Characteristics and assessment , 1987 .
[5] R. Gomory,et al. Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem , 1964 .
[6] Wieslaw Kubiak,et al. Sequencing of parts and robot moves in a robotic cell , 1989 .
[7] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[8] D. A. Wismer,et al. Solution of the Flowshop-Scheduling Problem with No Intermediate Queues , 1972, Oper. Res..
[9] Yoshiyuki Karuno,et al. Simultaneous Optimization of Tool Allocation and Scheduling for FMS's: An Application of Simulated Annealing , 1993, Robotics, Mechatronics and Manufacturing Systems.
[10] Yves Crama,et al. Cyclic Scheduling of Identical Parts in a Robotic Cell , 1997, Oper. Res..
[11] Alessandro Agnetis,et al. Batch Scheduling in a Two-machine Flow Shop with Limited Buffer , 1997, Discret. Appl. Math..