Product acquisition management: Current industry practice and a proposed framework

Remanufacturing requires that used products (cores) be obtained from the enduser at the end of their current life cycle so that the value-added may be recovered and the products returned to functional use again. The acquisition of cores to be remanufactured in such recoverable manufacturing systems is a complex set of activities that requires careful coordination to avoid the uncontrolled accumulation of core inventory, or unacceptable levels of customer service. The authors report on current industry practice via an extensive survey of North American remanufacturing firms. The authors propose a formal framework for Product Acquisition Management (PrAM) to coordinate, monitor, and provide an interface between reverse logistics and production planning and control activities. Finally, a series of managerial guidelines for the organization of PrAM activities is proposed. We conclude that managers should take actions that consistently reduce the variance inherent in a remanufacturing environment.

[1]  Rommert Dekker,et al.  Production planning and inventory control for remanufacturable durable products , 1996 .

[2]  Joseph Sarkis,et al.  The role of supply chain management within the industrial ecosystem , 1995, Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment ISEE (Cat. No.95CH35718).

[3]  E. Silver,et al.  Forecasting the returns of reusable containers , 1989 .

[4]  W. C. Benton,et al.  Supply-Chain Management for Recoverable Manufacturing Systems , 2000, Interfaces.

[5]  K. Richter The EOQ repair and waste disposal model with variable setup numbers , 1996 .

[6]  V. D. R. Guide Scheduling using drum-buffer-rope in a remanufacturing environment , 1996 .

[7]  Surendra M. Gupta,et al.  Disassembly of complex product structures with parts and materials commonality , 1997 .

[8]  Karl Inderfurth,et al.  Analysis of MRP Policies with Recovery Options , 1999 .

[9]  R. Guide,et al.  Rough-cut capacity planning for remanufacturing firms , 1997 .

[10]  Erwin van der Laan,et al.  Quantitative models for reverse logistics: A review , 1997 .

[11]  John A. Muckstadt,et al.  An analysis of single item inventory systems with returns , 1981 .

[12]  Leo Kroon,et al.  Returnable containers: an example of reverse logistics , 1995 .

[13]  Marc Salomon,et al.  Strategic Issues in Product Recovery Management , 1995 .

[14]  Peter Schuur,et al.  Physical Design of a Reverse Logistic Network: A Multi-Echelon Model , 1996 .

[15]  Iie T. N. Goh Senior Member,et al.  A Statistical Methodology for the Analysis of the Life-Cycle of Reusable Containers , 1986 .

[16]  Robert U. Ayres,et al.  Eco-efficiency, asset recovery and remanufacturing , 1997 .

[17]  Surendra M. Gupta,et al.  Operations Planning Issues in an Assembly/Disassembly Environment , 1994 .

[18]  M. S. Spencer,et al.  An evaluation of capacity planning techniques in a remanufacturing environment , 1997 .

[19]  V D R Guide,et al.  A closed-loop logistics model for remanufacturing , 1999, J. Oper. Res. Soc..

[20]  E. A. van deLaan,et al.  An (s,Q) inventory model with remanufacturing and disposal , 1996 .

[21]  Geraldo Ferrer,et al.  The economics of personal computer remanufacturing , 1997 .

[22]  Rajesh Srivastava,et al.  Product structure complexity and scheduling of operations in recoverable manufacturing , 1997 .

[23]  R. Stott,et al.  The World Bank , 2008, Annals of tropical medicine and parasitology.

[24]  Harold Krikke,et al.  Recovery strategies and reverse logistic network design , 2001 .

[25]  T. Spengler,et al.  Environmental integrated production and recycling management , 1997 .

[26]  V D R Guide,et al.  Buffering from material recovery uncertainty in a recoverable manufacturing environment , 1997 .

[27]  Rommert Dekker,et al.  Inventory Control in Hybrid Systems with Remanufacturing , 1999 .

[28]  K. Inderfurth Simple optimal replenishment and disposal policies for a product recovery system with leadtimes , 1997 .

[29]  Rajesh Srivastava,et al.  Scheduling policies for remanufacturing , 1997 .

[30]  Geraldo Ferrer,et al.  The economics of tire remanufacturing , 1997 .