Quoting manufacturing due dates subject to a service level constraint
暂无分享,去创建一个
[1] Lawrence M. Wein,et al. A broader view of the job-shop scheduling problem , 1992 .
[2] Timothy D. Fry,et al. Due Date Assignment in a Multistage Job Shop , 1989 .
[3] Nico Dellaert. Due-date setting and production control , 1991 .
[4] James H. Bookbinder,et al. Setting Job-Shop Due-Dates with Service-Level Constraints , 1985 .
[5] James K. Weeks. A Simulation Study of Predictable Due-Dates , 1979 .
[6] Silvanus J. Udoka,et al. An interdisciplinary laboratory for manufacturing education , 1993 .
[7] A A Hurley,et al. Principles of Quality Control , 1997, Current protocols in cytometry.
[8] Loren Paul Rees,et al. Using Neural Networks to Determine Internally-Set Due-Date Assignments for Shop Scheduling* , 1994 .
[9] M. Spearman,et al. Optimal Lead Time Policies , 1999 .
[10] Wallace J. Hopp,et al. Factory physics : foundations of manufacturing management , 1996 .
[11] Godwin J. Udo. An investigation of due-date assignment using workload information of a dynamic shop , 1993 .
[12] D. Carlton,et al. Equilibrium Fluctuations When Price and Delivery Lag Clear the Market , 1983 .
[13] Nabil R. Adam,et al. Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops , 1993 .
[14] S. T. Enns,et al. Job shop leadtime requirements under conditions of controlled delivery performance , 1994 .
[15] Wallace J. Hopp,et al. Setting WIP levels with statistical throughput control (STC) in CONWIP production lines , 1998 .
[16] Douglas C. Montgomery,et al. Introduction to Statistical Quality Control , 1986 .
[17] L. P. Rees,et al. Cost‐based due‐date assignment with the use of classical and neural‐network approaches , 1997 .
[18] Narayan Raman,et al. The job shop tardiness problem: A decomposition approach , 1993 .
[19] W. Hopp,et al. Quoting Customer Lead Times , 1995 .
[20] V. S. Gordon. A note on optimal assignment of slack due-dates in single-machine scheduling , 1993 .
[21] T.C.E. Cheng,et al. Survey of scheduling research involving due date determination decisions , 1989 .