Railway Tunnel Clearance Inspection Method Based on 3D Point Cloud from Mobile Laser Scanning
暂无分享,去创建一个
Shaohua Wang | Qingwu Hu | Qingzhou Mao | Yuhui Zhou | Xi Mei | Wangling Yin | Chunfeng Lin | Yuhui Zhou | Qingwu Hu | Qingzhou Mao | Shaohua Wang | X. Mei | Wangling Yin | Chunfeng Lin
[1] R Wenty. PLASSER'S IN SITU RAIL TREATMENT SYSTEM , 1980 .
[2] Stuart Robson,et al. Structural monitoring for the rail industry using conventional survey, laser scanning and photogrammetry , 2015 .
[3] Mark P. Kumler. An Intensive Comparison of Triangulated Irregular Networks (TINs) and Digital Elevation Models (DEMs) , 1994 .
[4] Dwight P. Miller. Distance and Clearance Perception Using Forward-Looking, Vehicular Television Systems* , 1988 .
[5] Nicole M. Gasparini,et al. An object-oriented framework for distributed hydrologic and geomorphic modeling using triangulated irregular networks , 2001 .
[6] Qingguo Liang,et al. Effect of Blast-Induced Vibration from New Railway Tunnel on Existing Adjacent Railway Tunnel in Xinjiang, China , 2012, Rock Mechanics and Rock Engineering.
[7] Seh-Chan Oh,et al. Vision-based object detection for passenger’s safety in railway platform , 2008, 2008 International Conference on Control, Automation and Systems.
[8] Zujun Yu,et al. Research on intrusion clearance detection system for high-speed railway based on binocular stereo vision , 2011, Proceedings of 2011 IEEE International Conference on Service Operations, Logistics and Informatics.
[9] Hongmei Shi,et al. Study on management information system of railway line clearance detection based on noncontact measurement technique , 2010, 2010 2nd International Conference on Industrial and Information Systems.
[10] Vassilis Gikas,et al. Three-Dimensional Laser Scanning for Geometry Documentation and Construction Management of Highway Tunnels during Excavation , 2012, Sensors.
[11] Guo Yin. Research on Calibration Method of Static Railway Vehicle Clearance Gauge , 2013 .
[12] F. Amberg. Tunnelling in high overburden with reference to deep tunnels in Switzerland , 2004 .
[13] Soohee Han,et al. Automated and Efficient Method for Extraction of Tunnel Cross Sections Using Terrestrial Laser Scanned Data , 2013, J. Comput. Civ. Eng..
[14] James H. Foster,et al. Compact Multipurpose Mobile Laser Scanning System - Initial Tests and Results , 2013, Remote. Sens..
[15] Tomasz Barszcz,et al. Mobile Laser Scanning Systems for Measuring the Clearance Gauge of Railways: State of Play, Testing and Outlook , 2016, Sensors.
[16] Juha Hyyppä,et al. The Use of a Mobile Laser Scanning System for Mapping Large Forest Plots , 2014, IEEE Geoscience and Remote Sensing Letters.
[17] Zhan Don. The Calibration Approach Study on the Multiple Vision Sensors for Railway Tunnel Clearance Full Cross-section Inspection , 2015 .
[18] Milivoj Vulić,et al. The Usability of Terrestrial 3D Laser Scanning Technology for Tunnel Clearance Analysis Application , 2014 .
[19] G. Jackel,et al. State-of-the-art of Non-destructive Testing Methods for Determining the State of a Tunnel Lining , 1995 .
[20] Wu Sha. Fast and Automatic Railway Building Structure Clearance Detection Technique Based on Mobile Binocular Stereo Vision , 2012 .
[21] Yang Wang,et al. High-speed railway clearance surveillance system based on convolutional neural networks , 2016, International Conference on Digital Image Processing.
[22] K Riessberger. CHECKING GAUGE CLEARANCE BY LASER ECHOES , 1980 .
[23] Zujun Yu,et al. FPGA-Based PCI Data Acquisition Synchronization Card of Railway Clearance Detection System , 2011 .
[24] Wang Li-min. Summary of the standard GB2585-2007 about hot rails for railway , 2008 .
[25] R D Franz. RAILROADS FOR NATIONAL DEFENSE AND THE DOD RAIL CLEARANCE PROFILE , 1981 .
[26] Wang Mingnian. Study on influence of blasting vibration on cross tunnels with small clearance , 2007 .
[27] Jian Xiao,et al. Multi-Camera and Structured-Light Vision System (MSVS) for Dynamic High-Accuracy 3D Measurements of Railway Tunnels , 2015, Sensors.
[28] Juha Hyyppä,et al. Data Processing and Quality Evaluation of a Boat-Based Mobile Laser Scanning System , 2013, Sensors.
[29] Seh-Chan Oh,et al. Railway platform monitoring system using stereo vision algorithm for passenger's safety , 2009, INTELEC 2009 - 31st International Telecommunications Energy Conference.
[30] Mingming Jiang,et al. A New Filtering and Smoothing Algorithm for Railway Track Surveying Based on Landmark and IMU/Odometer , 2017, Sensors.
[31] J. J. Aguilar,et al. Development of a stereo vision system for non-contact railway concrete sleepers measurement based in holographic optical elements , 2005 .
[32] 景司 横瀬,et al. ばね-摩擦直列結合方式車両の走行安定性解析 : 第2報,ボルスタアンカー取付け部に遊間のある車体だ行動 , 1986 .