Crane operation planning in overlapping areas through dynamic supply selection

Abstract The planning of tower crane operations is a complex process that has significant impact on the time, cost, productivity, and safety of construction projects. This complexity pertains to the involvement of multiple tasks, cranes, and material supply locations, as well as their interactions with each other. Overlapping areas between cranes also lead to increased collision possibilities, resulting in additional crane operation complexity. To increase crane operation productivity while maintaining safety, proper linkage between tasks, cranes, and material supply locations is important. Past research has linked tasks to supply points based on minimized individual task operating time, such that a task is linked to a supply point that provides the minimum amount of time for task completion. This approach may not be as efficient as possible for construction sites with overlapping crane areas, as it may increase total project time although time for each individual task is at a minimum. To address this concern, this research develops a Java-based, agent-based modeling (ABM) simulation tool to investigate the effects of dynamic supply selection on crane efficiency. This ABM applies a dynamic supply selection system and tests numerous scenarios to ensure the most efficient linkage between tasks, cranes, and supply locations. To evaluate the capabilities of the developed method, it has been applied to a real-world construction project. The results of this case study indicate that effective crane operation planning, conducted through dynamic supply location selection, with respect to tasks and cranes, can have a significant impact on productivity and the total schedule time of crane tasks.

[1]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[2]  Hesham Osman,et al.  Agent-based simulation of urban infrastructure asset management activities , 2012 .

[3]  Heng Li,et al.  Understanding the relationship between safety investment and safety performance of construction projects through agent-based modeling. , 2016, Accident; analysis and prevention.

[4]  C. M. Tam,et al.  Genetic Algorithm for Optimizing Supply Locations around Tower Crane , 2001 .

[5]  Ali Akbarnezhad,et al.  Closure to “Location Optimization of Tower Crane and Allocation of Material Supply Points in a Construction Site Considering Operating and Rental Costs” by Zahra Sadat Moussavi Nadoushani, Ahmed W. A. Hammad, and Ali Akbarnezhad , 2018 .

[6]  Amr A. Oloufa,et al.  Enhanced crane operations in construction using service request optimization , 2014 .

[7]  Mohamed Marzouk,et al.  Tower cranes layout planning using agent-based simulation considering activity conflicts , 2018, Automation in Construction.

[8]  Mohamed Marzouk,et al.  Decision support for tower crane selection with building information models and genetic algorithms , 2016 .

[9]  Jack C. P. Cheng,et al.  Formulation and analysis of dynamic supply chain of backfill in construction waste management using agent-based modeling , 2015, Adv. Eng. Informatics.

[10]  Hossam Ali,et al.  Modeling safety considerations and space limitations in piling operations using agent based simulation , 2013, Expert Syst. Appl..

[11]  Mohammad Reza Nikoo,et al.  A coupled agent-based risk-based optimization model for integrated urban water management , 2020 .

[12]  Mohamed Al-Hussein,et al.  Algorithm for Mobile Crane Walking Path Planning in Congested Industrial Plants , 2015 .

[13]  Wai Kin Chan,et al.  Agent-based simulation tutorial - simulation of emergent behavior and differences between agent-based simulation and discrete-event simulation , 2010, Proceedings of the 2010 Winter Simulation Conference.

[14]  Yang Miang Goh,et al.  A hybrid simulation approach for integrating safety behavior into construction planning: An earthmoving case study. , 2016, Accident; analysis and prevention.

[15]  Simaan M. AbouRizk,et al.  Auction-based Simulation for Industrial Crane Operations , 2019, Automation in Construction.

[16]  Farook Hamzeh,et al.  Optimizing Joint Operation of Two Tower Cranes Through Look-Ahead Planning and Process Simulation , 2014 .

[17]  D. Fang,et al.  An agent-based modeling approach for understanding the effect of worker-management interactions on construction workers' safety-related behaviors , 2019, Automation in Construction.

[18]  Khaled Mohamed Shawki,et al.  GA optimization model for solving tower crane location problem in construction sites , 2015 .

[19]  Mohamed Al-Hussein,et al.  A methodology for mobile crane lift path checking in heavy industrial projects , 2013 .

[20]  Ulrich Hermann,et al.  Automated Crane Planning and Optimization for modular construction , 2018, Automation in Construction.

[21]  Michael J. North,et al.  Agent-based modeling and simulation: ABMS examples , 2008, 2008 Winter Simulation Conference.

[22]  Farook Hamzeh,et al.  Crane overlap and operational flexibility: balancing utilization, duration, and safety , 2018 .

[23]  Chi Ming Tam,et al.  Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming , 2011 .

[24]  Miroslaw J. Skibniewski,et al.  Simulation of Accuracy Performance for Wireless Sensor-Based Construction Asset Tracking , 2009, Comput. Aided Civ. Infrastructure Eng..

[25]  Min-Yuan Cheng,et al.  Particle bee algorithm for tower crane layout with material quantity supply and demand optimization , 2014 .

[26]  Chimay J. Anumba,et al.  Learning in multi-agent systems: a case study of construction claims negotiation , 2002, Adv. Eng. Informatics.

[27]  Bo Xu,et al.  A BIM-based approach for automated tower crane layout planning , 2015 .

[28]  Islam H. El-adaway,et al.  Multiagent System for Construction Dispute Resolution (MAS-COR) , 2010 .

[29]  Omer Tatari,et al.  INTEGRATED AGENT-BASED CONSTRUCTION EQUIPMENT MANAGEMENT: CONCEPTUAL DESIGN , 2006 .

[30]  Cheng Zhang,et al.  Collaborative multi-agent systems for construction equipment based on real-time field data capturing , 2009, J. Inf. Technol. Constr..

[31]  Shoujian Zhang,et al.  Understanding the Social Contagion Effect of Safety Violations within a Construction Crew: A Hybrid Approach Using System Dynamics and Agent-Based Modeling , 2018, International journal of environmental research and public health.

[32]  Joseph H. M. Tah,et al.  Towards an agent-based construction supply network modelling and simulation platform , 2005 .

[33]  Antonio Fioravanti,et al.  BIM AND AGENT-BASED MODEL INTEGRATION FOR CONSTRUCTION MANAGEMENT OPTIMIZATION , 2017 .

[34]  A. Kaveh,et al.  TOWER CRANES AND SUPPLY POINTS LOCATING PROBLEM USING CBO, ECBO, AND VPS , 2017, 1811.05963.

[35]  Javier Irizarry,et al.  Optimizing location of tower cranes on construction sites through GIS and BIM integration , 2012, J. Inf. Technol. Constr..

[36]  JoonOh Seo,et al.  Simulation-Based Assessment of Workers' Muscle Fatigue and Its Impact on Construction Operations , 2016 .

[37]  Farook Hamzeh,et al.  Near-Real-Time Optimization of Overlapping Tower Crane Operations: A Model and Case Study , 2017 .

[38]  Kyoungmin Kim,et al.  Multi-agent-based simulation system for construction operations with congested flows , 2010 .

[39]  Gary David Holt,et al.  Location optimization for a group of tower cranes , 1999 .

[40]  Sue McNeil,et al.  Agent-Based Modeling: Approach for Improving Infrastructure Management , 2008 .

[41]  Ali Akbarnezhad,et al.  Location Optimization of Tower Crane and Allocation of Material Supply Points in a Construction Site Considering Operating and Rental Costs , 2017 .

[42]  Mohamed Al-Hussein,et al.  Automated Method for Checking Crane Paths for Heavy Lifts in Industrial Projects , 2013 .

[43]  Hans C. Bjornsson,et al.  Agent-based construction supply chain simulator (CS2) for measuring the value of real-time information sharing in construction , 2008 .

[44]  Eric Bonabeau,et al.  Agent-based modeling: Methods and techniques for simulating human systems , 2002, Proceedings of the National Academy of Sciences of the United States of America.

[45]  Anil Sawhney,et al.  Modeling Construction Safety as an Agent-Based Emergent Phenomenon , 2007 .

[46]  C. M. Tam,et al.  GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction , 2003 .

[47]  Pierre Lemarinier,et al.  Agent Based Modelling and Simulation tools: A review of the state-of-art software , 2017, Comput. Sci. Rev..

[48]  Tarek Zayed,et al.  Agent-based modeling and simulation of earthmoving operations , 2017 .