Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints
暂无分享,去创建一个
[1] Kripa Shanker,et al. A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items , 2009 .
[2] Fei Ye,et al. Supply chain coordination model with controllable lead time and service level constraint , 2011, Comput. Ind. Eng..
[3] Dmitry Krass,et al. Inventory models with minimal service level constraints , 2001, Eur. J. Oper. Res..
[4] Sarada Prasad Sarmah,et al. Coordination of a single-manufacturer/multi-buyer supply chain with credit option , 2008 .
[5] S. Goyal. “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .
[6] M. A. Hoque,et al. An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors , 2011, Eur. J. Oper. Res..
[7] James J. Solberg,et al. Operations Research: Principles and Practice. , 1977 .
[8] Mohammad A. Hoque,et al. Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization , 2011 .
[9] Suresh Kumar Goyal,et al. A one-vendor multi-buyer integrated inventory model: A comment , 1995 .
[10] Ilkyeong Moon,et al. The distribution free continuous review inventory system with a service level constraint , 1994 .
[11] C. Liao,et al. An Analytical Determination of Lead Time with Normal Demand , 1991 .
[12] Liang-Yuh Ouyang,et al. Mixture inventory model involving variable lead time with a service level constraint , 1997, Comput. Oper. Res..
[13] Wen-Chuan Lee,et al. Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate , 2006, Appl. Math. Comput..
[14] Lu Lu. A one-vendor multi-buyer integrated inventory model , 1995 .
[15] M. A. Hoque,et al. Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain , 2008, Eur. J. Oper. Res..
[16] L. Ouyang,et al. Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .
[17] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[18] Chia-Huei Ho,et al. The Single-Vendor Single-Buyer Integrated inventory Problem with Quality Improvement and lead Time Reduction - minimax Distribution-Free Approach , 2006, Asia Pac. J. Oper. Res..
[19] Jonathan Burton,et al. Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers , 1994 .
[20] Roger M. Hill,et al. The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem , 1999 .
[21] R. J. Tersine. Principles of inventory and materials management , 1982 .
[22] Shu-Lu Hsu,et al. Replenishment and Lead Time Decisions in Manufacturer-Retailer Chains , 2009 .
[23] Jason Chao-Hsien Pan,et al. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .
[24] Arthur F. Veinott,et al. Analysis of Inventory Systems , 1963 .
[25] Kripa Shanker,et al. Two-echelon supply chain inventory model with controllable lead time and service level constraint , 2009, Comput. Ind. Eng..
[26] Jason Chao-Hsien Pan,et al. A study of an integrated inventory with controllable lead time , 2002 .
[27] Fassil Nebebe,et al. Determination of economic production-shipment policy for a single-vendor-single-buyer system , 2000, Eur. J. Oper. Res..
[28] L. Ouyang,et al. An integrated vendor–buyer inventory model with quality improvement and lead time reduction , 2007 .
[29] Liang-Yuh Ouyang,et al. A periodic review inventory model involving variable lead time with a service level constraint , 2000, Int. J. Syst. Sci..
[30] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[31] Avijit Banerjee,et al. A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange , 1994 .
[32] R. Hill. The single-vendor single-buyer integrated production-inventory model with a generalised policy , 1997 .