Risk Based Capacity Planning Method for Semiconductor Fab with Queue Time Constraints
暂无分享,去创建一个
S. Kitamura | A. Ono | K. Mori
[1] John A. White,et al. Analysis of queueing systems , 1975 .
[2] Jennifer K. Robinson,et al. Capacity planning for semiconductor wafer fabrication with time constraints between operations , 1999, WSC '99.
[3] T. Fukuda,et al. Artificial immunity based management system for a semiconductor production line , 1997, 1997 IEEE International Conference on Systems, Man, and Cybernetics. Computational Cybernetics and Simulation.