VALIDATION OF THE SERVICEABILITY OF THE MANUFACTURING SYSTEM USING SIMULATION
暂无分享,去创建一个
[1] Peter Brucker,et al. Scheduling Algorithms , 1995 .
[2] Vladimir Modrak,et al. Impacts of RFID implementation on cost structure in networked manufacturing , 2012 .
[3] Bronislav Chramcov,et al. Modelling and Simulation of the Order Realization in the Serial Production System , 2011 .
[4] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[5] W. Ames. Algorithms (2nd edition) , 1990 .
[6] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[7] Anu Maria,et al. Introduction to modeling and simulation , 1997, WSC '97.
[8] Dileep R. Sule,et al. Sequencing n jobs on two machines with setup, processing and removal times separated , 1982 .
[9] J. Carlier,et al. Two branch and bound algorithms for the permutation flow shop problem , 1996 .
[10] J. Carson. Introduction to modeling and simulation , 2005, Proceedings of the Winter Simulation Conference, 2005..
[11] Jatinder N. D. Gupta,et al. A Functional Heuristic Algorithm for the Flowshop Scheduling Problem , 1971 .