Focusing the Fuzzy Front-End in New Product Development

Effectively managing the "upfront or fuzzy front-end" (FFE) of the product development process is one of the most important, difficult challenges facing innovation managers. In this paper, we define the FFE as the period between when an opportunity is first considered and when an idea is judged ready for development. We classify the outcomes of the FFE into product definition, time, and people dimensions. We suggest several strategies to manage the FFE by assigning a FFE manager or team; by providing organizational support for FFE activities; by understanding the sources of FFE ambiguity; by building an information system; and by developing relationships with supporters, partners, and alliances.

[1]  Edward F. McDonough,et al.  Speeding Up New Product Development: The Effects of Leadership Style and Source of Technology , 1991 .

[2]  D. Wilemon,et al.  Accelerating the Development of Technology-Based New Products , 1990 .

[3]  A. Chakrabarti,et al.  Speeding Up the Pace of New Product Development , 1999 .

[4]  A. Bonaccorsi,et al.  Strategic Partnerships in New Product Development: an Italian Case Study , 1994 .

[5]  Milton D. Rosenau,et al.  From experience: Faster new product development , 1988 .

[6]  B. Zirger,et al.  A study of success and failure in product innovation: The case of the U.S. electronics industry , 1984, IEEE Transactions on Engineering Management.

[7]  D. Leonard-Barton,et al.  Wellsprings of Knowledge: Building and Sustaining the Sources of Innovation , 1995 .

[8]  Robert Kevin Grigsby "Wellsprings of Knowledge: Building and Sustaining the Sources of Innovation" , 1996 .

[9]  Preston G. Smith,et al.  Developing products in half the time , 1995 .

[10]  Robert G. Cooper,et al.  Benchmarking new product performance:: Results of the best practices study , 1998 .

[11]  R. Schmenner,et al.  Collapsing new product development times: Six case studies , 1992 .

[12]  J. B. Quinn,et al.  Managing Innovation: Controlled Chaos , 1985 .

[13]  Greg A. Stevens,et al.  3,000 Raw Ideas = 1 Commercial Success! , 1997 .

[14]  D. Wilemon,et al.  A Survey of Major Approaches for Accelerating New Product Development , 1992 .

[15]  Alfredo M. Choperena Fast Cycle Time—Driver of Innovation and Quality , 1996 .

[16]  K. Atuahene–Gima,et al.  An exploratory analysis of the impact of market orientation on new product performance a contingency approach , 1995 .

[17]  R. Chandy,et al.  Organizing for Radical Product Innovation: The Overlooked Role of Willingness to Cannibalize , 1998 .

[18]  L. Dwyer,et al.  Organizational Environment, New Product Process Activities, and Project Outcomes , 1991 .

[19]  Tony M. O'Driscoll,et al.  From experience: applying performance support technology in the fuzzy front end , 2000 .

[20]  Dirk Deschoolmeester,et al.  R&D/marketing communication during the fuzzy front-end , 1995 .

[21]  T. Fujimoto,et al.  The Effect of “ Front-Loading ” Problem-Solving on Product Development Performance , 2000 .

[22]  Preston G. Smith,et al.  Shortening the Product Development Cycle , 1992 .

[23]  Edward F. McDonough,et al.  Faster new product development: Investigating the effects of technology and characteristics of the project leader and team , 1993 .

[24]  Stephen R. Rosenthal,et al.  Towards holistic front ends in new product development , 1998 .

[25]  S. R. Rosenthal,et al.  Integrating the Fuzzy Front End of New Product Development , 1997 .

[26]  Mark E. Parry,et al.  How the Japanese Manage the R&D–Marketing Interface , 1993 .

[27]  R. Cooper Predevelopment activities determine new product success , 1988 .

[28]  Vinod Kumar,et al.  The front end of new product development: a Canadian survey , 1997 .

[29]  Bela Gold,et al.  Approaches to accelerating product and process development , 1987 .

[30]  Kwong-Sak Leung,et al.  Future directions of fuzzy theory and systems , 1995 .

[31]  Mushin Lee,et al.  Determinants of technical success in product development when innovative radicalness is considered , 1994 .

[32]  P. Murmann Expected development time reductions in the German mechanical engineering industry , 1994 .

[33]  R. Cooper,et al.  Success factors in product innovation , 1987 .

[34]  W. C. Herbein,et al.  Front-End Innovation at AlliedSignal and Alcoa , 1999 .

[35]  Preston G. Smith,et al.  Developing products in half the time: new rules, new tools 10 [Book Review] , 1997, IEEE Engineering Management Review.

[36]  Marco Iansiti,et al.  Real-world R&D: jumping the product generation gap , 1999 .

[37]  William L. Moore,et al.  New product development practices of industrial marketers , 1987 .

[38]  A. Griffin The Effect of Project and Process Characteristics on Product Development Cycle Time , 1997 .

[39]  Norman W. McGuinness,et al.  Managing the search for new product concepts: a strategic approach , 1989 .

[40]  Eulalia Szmidt,et al.  Fuzzy thinking. The new science of fuzzy logic , 1996 .

[41]  Robert W. Ruekert,et al.  Marketing's Interaction with Other Functional Units: A Conceptual Framework and Empirical Evidence , 1987 .

[42]  R. Cooper,et al.  0 0 0 0 An Investigation into the New Product Process : Steps , Deficiencies , and Impact , 1986 .

[43]  Donald G. Reinertsen,et al.  Taking the Fuzziness Out of the Fuzzy Front End , 1999 .

[44]  R. Cooper,et al.  Resource allocation in the new product process , 1988 .