In a large scale of excavation for the foundation of large-sized structures and underground structures, a considerable amount of earth pressure can occur. Steel beams that have been used to form a temporary structure to support earth pressure may be less economical and less efficient in resisting the high earth pressure. To cope with this problem, PCT(Precast Concrete Truss) system has been devised and investigated both experimentally and analytically. A proper connection method between the concrete truss members was proposed to accommodate fast assembly and disassembly. Full-scale test of PCT system was performed to verify the load-carrying capacity of the PCT system including the connections. The test results were compared with those of structural analysis. The test specimen which corresponds to PCT strut attained the ultimate load without buckling, but the detail of connector members needs to be improved. It is expected that precast concrete truss members can be efficiently incorporated into a temporary structure for deep and large excavation by replacing conventional steel beams.
[1]
정은성,et al.
로버스트 우선순위 결정을 위한 Fuzzy 다기준 의사결정기법의 적용
,
2013
.
[2]
Moon-Young Kim,et al.
Design of Building Excavation Plane in Innovative Prestressed Scaffolding(IPS) System
,
2006
.
[3]
장봉석,et al.
저온 소성한 MgO 분말을 혼입한 콘크리트의 내구 특성
,
2011
.
[4]
Seungjun Kim,et al.
A Study on Behavior Characteristics of Precast Coping Part under Axial Load
,
2011
.
[5]
Chul-Hun Chun,et al.
Continuity of PSC Composite Bridge with Precast Decks
,
2007
.
[6]
Chang-Hong Lee,et al.
An Experimental Study on the Joints in Ultra High Performance Precast Concrete Segmental Bridges
,
2011
.
[7]
Sang-hoon Han,et al.
An Experimental Study on Uniaxial Compressive Behavior of RC Circular Columns Laterally Confined with Prestressing Aramid Fiber Strap
,
2009
.