The interval design of pipe jacking tunnel close quarters crossing existing metro shield

Combining with the electric power tunnel engineering examples of Longziwan district Xipu Chengdu,researched the pipe jacking tunnel construction mechanics,analyzed the key points of engineering design and construction technology control key methods,and made the force simulation calculation and safety analysis on existing metro interval,accumulated certain experience for similar engineering.