Metaheuristics Applied in Remanufacturing and Reverse logistics: A review

Due to growing environmental concerns, a large number of companies and organizations in the world give importance to reverse logistics and remanufacturing. Remanufacturing which aims is to take care of used or damaged product in the purpose of returning it like new product, lead many researchers to study the integration of this reverse flow in the process of the forward supply chain. The resulting models are difficult and complex to solve and optimize, hence the need to integrate a strong and efficient method such as Metaheuristics to solve those complex optimization problems. The purpose of this study is to review the published literature on the issues of reverse logistics and remanufacturing, and classified these papers by the type of metaheuristic used. Also, it aims to outline some future opportunities for research based on research gap analysis.

[1]  Kwok Hung Lau,et al.  Reverse logistics in the electronic industry of China: a case study , 2009 .

[2]  Yongjian Li,et al.  Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing , 2007 .

[3]  Mostafa Zandieh,et al.  A hybrid spanning tree-based genetic/simulated annealing algorithm for a closed-loop logistics network design problem , 2015, Int. J. Appl. Decis. Sci..

[4]  Hsiao-Fan Wang,et al.  A closed-loop logistic model with a spanning-tree based genetic algorithm , 2010, Comput. Oper. Res..

[5]  Napsiah Ismail,et al.  A Review of Nature-Based Algorithms Applications in Green Supply Chain Problems , 2014 .

[6]  Shona D. Morgan,et al.  A systematic literature review of remanufacturing scheduling , 2013 .

[7]  Min Huang,et al.  A retailer oriented closed-loop supply chain network design for end of life construction machinery remanufacturing , 2016 .

[8]  Lingling Li,et al.  An optimal solution to the remanufacturing facility layout problem , 2014, Proceeding of the 11th World Congress on Intelligent Control and Automation.

[9]  Adel M. Alimi,et al.  A Particle Swarm Optimization Algorithm for the Grasp Planning Problem , 2012, ICINCO.

[10]  Nan Li,et al.  Research on location of remanufacturing factory based on particle swarm optimization , 2011, MSIE 2011.

[11]  Halit Üster,et al.  Tabu Search and Benders Decomposition Approaches for a Capacitated Closed-Loop Supply Chain Network Design Problem , 2009, Transp. Sci..

[12]  Robert Pellerin,et al.  Production rate control for stochastic remanufacturing systems , 2008 .

[13]  Erwin van der Laan,et al.  Leadtime effects and policy improvement for stochastic inventory control with remanufacturing , 2001 .

[14]  Davide Giglio,et al.  A simulated annealing approach for the capacitated dynamic lot sizing problem in a closed remanufacturing system , 2016 .

[15]  Zeger Degraeve,et al.  Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches , 2004, Eur. J. Oper. Res..

[16]  Gudrun P. Kiesmüller,et al.  A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes , 2003, Eur. J. Oper. Res..

[17]  Patrick Siarry,et al.  A survey on optimization metaheuristics , 2013, Inf. Sci..

[18]  Govindan Kannan,et al.  Issues in reverse supply chains, part II: reverse distribution issues – an overview , 2008 .

[19]  Gao Ya,et al.  Optimal strategies for manufacturing/remanufacturing system with the consideration of recycled products , 2015, Comput. Ind. Eng..

[20]  Akshay Mutha,et al.  Perspectives in reverse logistics : A review , 2009 .

[21]  Horst Tempelmeier,et al.  Dynamic capacitated lot-sizing problems: a classification and review of solution approaches , 2010, OR Spectr..

[22]  C. McMahon,et al.  Reducing waste: repair, recondition, remanufacture or recycle? , 2006 .

[23]  Roya Soltani,et al.  A reverse logistics network for recovery systems and a robust metaheuristic solution approach , 2014 .

[24]  Javad Rezaeian,et al.  Robust meta-heuristics implementation for unrelated parallel machines scheduling problem with rework processes and machine eligibility restrictions , 2014, Comput. Ind. Eng..

[25]  Gerald W. Evans,et al.  A genetic algorithm-based heuristic for the dynamic integrated forward/reverse logistics network for 3PLs , 2007, Comput. Oper. Res..

[26]  Mir Saman Pishvaee,et al.  Reverse logistics network design using simulated annealing , 2010 .

[27]  Esmaeil Mehdizadeh,et al.  THREE METAHEURISTIC ALGORITHMS FOR SOLVING THE MULTI-ITEM CAPACITATED LOT-SIZING PROBLEM WITH PRODUCT RETURNS AND REMANUFACTURING , 2014 .

[28]  Mohamad Y. Jaber,et al.  A review of mathematical inventory models for reverse logistics and the future of its modeling: An environmental perspective , 2016 .

[29]  George Tagaras,et al.  Optimal collection and remanufacturing decisions in reverse supply chains with collector’s imperfect sorting , 2014 .

[30]  Surendra M. Gupta,et al.  A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..

[31]  Luigi Maria Galantucci,et al.  Assembly and Disassembly Planning by using Fuzzy Logic & Genetic Algorithms , 2004, ArXiv.

[32]  Kannan Govindan,et al.  Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future , 2015, Eur. J. Oper. Res..

[33]  Chandra Lalwani,et al.  Reverse logistics network design: a state-of-the-art literature review , 2009, Int. J. Bus. Perform. Supply Chain Model..

[34]  Diane Riopel,et al.  Logistique inverse : revue de littérature , 2003 .

[35]  James F. C. Windmill,et al.  Design for remanufacture: a literature review and future research needs , 2011 .

[36]  Winifred Ijomah,et al.  Addressing decision making for remanufacturing operations and design-for-remanufacture , 2009 .

[37]  Rajesh K. Singh,et al.  A literature review and perspectives in reverse logistics , 2015 .

[38]  Hokey Min,et al.  Designing a closed-loop supply chain with stochastic product returns: a Genetic Algorithm approach , 2011 .

[39]  Kai-jun Zhou,et al.  Remanufacturing closed-loop supply chain network design based on genetic particle swarm optimization algorithm , 2012 .

[40]  Jean-Philippe Gayon,et al.  On the optimal control of manufacturing and remanufacturing activities with a single shared server , 2014, Eur. J. Oper. Res..

[41]  Necati Aras,et al.  Locating collection centers for distance- and incentive-dependent returns , 2008 .

[42]  Eva Ponce-Cueto,et al.  Forecasting the returns in reusable containers’ closed-loop supply chains. A case in the LPG industry. , 2009 .

[43]  Ioannis Konstantaras,et al.  Metaheuristic optimization for the Single-Item Dynamic Lot Sizing problem with returns and remanufacturing , 2015, Comput. Ind. Eng..

[44]  Sergio Rubio,et al.  Characteristics of the research on reverse logistics (1995–2005) , 2008 .

[45]  Yanhui Li,et al.  A Hybrid Genetic-Simulated Annealing Algorithm for the Location-Inventory-Routing Problem Considering Returns under E-Supply Chain Environment , 2013, TheScientificWorldJournal.

[46]  Hamed Soleimani,et al.  A hybrid particle swarm optimization and genetic algorithm for closed-loop supply chain network design in large-scale networks , 2015 .

[47]  Hokey Min,et al.  A genetic algorithm approach to developing the multi-echelon reverse logistics network for product returns , 2006 .

[48]  Yadong Luo,et al.  Creating Competitive Advantages Through New Value Creation: A Reverse Logistics Perspective , 2007 .

[49]  Samir K. Srivastava,et al.  Green Supply-Chain Management: A State-of-the-Art Literature Review , 2007 .

[50]  Ioannis Konstantaras,et al.  A FIRST STUDY OF PARTICLE SWARM OPTIMIZATION ON THE DYNAMIC LOT SIZING PROBLEM WITH PRODUCT RETURNS , 2013 .

[51]  Rommert Dekker,et al.  Reverse Logistics - a framework , 2002 .

[52]  Cherng Ying Chiou,et al.  Consideration Factors of Reverse Logistics Implementation -A Case Study of Taiwan's Electronics Industry , 2012 .

[53]  Hark Hwang,et al.  A Manufacturing/Remanufacturing System with the Consideration of Required Quality of End-of-used Products , 2010 .

[54]  Pierre Dejax,et al.  Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain , 2012 .

[55]  Lingling Li,et al.  A color petri net based scheduling model for remanufacturing system with stochastic process routing , 2014, 2014 IEEE International Conference on Automation Science and Engineering (CASE).

[56]  E. Kongar,et al.  A multiple objective tabu search approach for end-of-life product disassembly , 2009, Int. J. Adv. Oper. Manag..

[57]  A. Gunasekaran,et al.  Factors for implementing end-of-life product reverse logistics in the Chinese manufacturing sector , 2014 .

[58]  Surendra M. Gupta,et al.  Simulated Annealing Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem , 2013, MIM.

[59]  Fred Glover,et al.  Tabu Search - Part II , 1989, INFORMS J. Comput..

[60]  Ying Tang,et al.  An Optimization Method for the Remanufacturing Dynamic Facility Layout Problem with Uncertainties , 2015 .

[61]  Pedro Piñeyro,et al.  The economic lot-sizing problem with remanufacturing: analysis and an improved algorithm , 2015 .

[62]  Ben A. Chaouch,et al.  A robust block-chain based tabu search algorithm for the dynamic lot sizing problem with product returns and remanufacturing , 2014 .

[63]  Adrien Presley,et al.  The theory and practice of Reverse Logistics , 2007 .

[64]  Farzad Dehghanian,et al.  Designing sustainable recovery network of end-of-life products using genetic algorithm , 2009 .

[65]  G. Kannan,et al.  Analysis of closed loop supply chain using genetic algorithm and particle swarm optimisation , 2009 .

[66]  Ronald S. Tibben-Lembke,et al.  Going Backwards: Reverse Logistics Trends and Practices , 1999 .

[67]  W. C. Benton,et al.  Forecasting Product Returns for Remanufacturing Operations , 2012, Decis. Sci..

[68]  T. T. Narendran,et al.  PRISM: PRIority based SiMulated annealing for a closed loop supply chain network design problem , 2013, Appl. Soft Comput..

[69]  Mehmet Ali Ilgin,et al.  Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.

[70]  Dmitry Krass,et al.  Dynamic lot sizing with returning items and disposals , 2002 .

[71]  H. He,et al.  Reverse Logistics Demand Forecasting under Demand Uncertainty , 2010 .

[72]  Yongjian Li,et al.  Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution , 2006, OR Spectr..

[73]  Simme Douwe P. Flapper,et al.  Coordination of manufacturing, remanufacturing and returns acceptance in hybrid manufacturing/remanufacturing systems , 2014 .

[74]  Andrew Y. C. Nee,et al.  A simulation-based genetic algorithm approach for remanufacturing process planning and scheduling , 2015, Appl. Soft Comput..

[75]  Fred W. Glover,et al.  Tabu Search - Part I , 1989, INFORMS J. Comput..

[76]  Young Hae Lee,et al.  Vehicle routing scheduling for cross-docking in the supply chain , 2006, Comput. Ind. Eng..