A SWOT analysis of total productive maintenance frameworks
暂无分享,去创建一个
[1] P. Jonsson,et al. Evaluation and improvement of manufacturing performance measurement systems ‐ the role of OEE , 1999 .
[2] Terry Wireman. Total Productive Maintenance , 2004 .
[3] Henry Mintzberg. The rise and fall of strategic planning , 1993 .
[4] Wilson Cc,et al. Jacks of all trades: masters of none? , 1987 .
[5] M. Helms,et al. Total Productive Maintenance and Its Link to Total Quality Management , 1994 .
[6] لطیفی نژاد مرجان,et al. An Introduction To Total Productive Maintenance(TPM) معرفی نگهداری و تعمیرات جامع , 2005 .
[7] Salih O. Duffuaa,et al. Maintenance and quality: the missing link , 1995 .
[8] Benjamin S. Blanchard. An enhanced approach for implementing total productive maintenance in the manufacturing environment , 1994 .
[9] Õrjan Ljungberg,et al. Measurement of overall equipment effectiveness as a basis for TPM activities , 1998 .
[10] Nagen Nagarur,et al. An object‐oriented decision support system for maintenance management , 1999 .
[11] M. Yeomans,et al. Getting Maintenance Into Tpm , 1997 .
[12] L. Pintelon,et al. A framework for maintenance concept development , 2002 .
[13] Heinz Weihrich,et al. The TOWS matrix—A tool for situational analysis , 1982 .
[14] H. Yamashina,et al. Challenge to world‐class manufacturing , 2000 .
[15] D. Tripathi,et al. Relationship between TQM and TPM implementation factors and business performance of manufacturing industry in Indian context , 2005 .
[16] Samir Ismail Mostafa. Implementation of proactive maintenance in the Egyptian Glass Company , 2004 .
[17] R. Keith Mobley,et al. An introduction to predictive maintenance , 1989 .
[18] John J. Lawrence. Use mathematical modeling to give your TPM implementation effort an extra boost , 1999 .
[19] N. Piercy,et al. Making SWOT Analysis Work , 1989 .
[20] M. T. Hides,et al. Factors affecting successful implementation of total productive maintenance , 1999 .
[21] Lawrence M. Corbett,et al. An international study of quality improvement approach and firm performance , 1997 .
[22] Richard Greatbanks,et al. Overall equipment effectiveness as a measure of operational improvement – A practical analysis , 2000 .
[23] P. Kotler,et al. Principles of Marketing , 1983 .
[24] Shamsuddin Ahmed,et al. State of implementation of TPM in SMIs: a survey study in Malaysia , 2004 .
[25] Lee Herring. Total productive maintenance in America , 1998 .
[26] F. Cooke. Implementing TPM in plant maintenance: some organisational barriers , 2000 .
[27] S.Ahmed M.Hassan and Z.Taha. TPM can go beyond maintenance: excerpt from a case implementation , 2005 .
[28] Michael Y. Hu,et al. The human factor in advanced manufacturing technology adoption , 1998 .
[29] Terry Wireman. Total Productive Maintenance: An American Approach , 1992 .
[30] Basim Al-Najjar,et al. Total quality maintenance: An approach for continuous reduction in costs of quality products , 1996 .
[31] L. Swanson. Linking maintenance strategies to performance , 2001 .
[32] Roberto Cigolini,et al. Total productive maintenance practices: a survey in Italy , 1997 .
[33] Barrie Dale,et al. A study of total productive maintenance implementation , 2001 .
[34] Fu-Kwun Wang,et al. Learning curve analysis in total productive maintenance , 2001 .
[35] Ashraf Labib. A framework for benchmarking appropriate productive maintenance , 1999 .
[36] Werner A.J. Schippers,et al. An integrated approach to process control , 2001 .
[37] Albert H. C. Tsang,et al. TPM implementation in China: a case study , 2000 .