A lognormal approximation of activity duration in PERT using two time estimates
暂无分享,去创建一个
[1] Wayne D. Cottrell,et al. Simplified Program Evaluation and Review Technique (PERT) , 1999 .
[2] I. M. Premachandra. An approximation of the activity duration distribution in PERT , 2001, Comput. Oper. Res..
[3] Amy Hing-Ling Lau,et al. A simple and logical alternative for making PERT time estimates , 1996 .
[4] David Johnson,et al. Triangular approximations for continuous random variables in risk analysis , 2002, J. Oper. Res. Soc..
[5] E. W. Davis,et al. Project Management With Cpm, Pert and Precedence Diagramming , 1983 .
[6] Michael T. Callahan,et al. Construction Project Scheduling , 1991 .
[7] J. Berny. A New Distribution Function for Risk Analysis , 1989 .
[8] Nicholas R. Farnum,et al. Some Results Concerning the Estimation of Beta Distribution Parameters in PERT , 1987 .
[9] D. Golenko-Ginzburg. On the Distribution of Activity Time in PERT , 1988 .
[10] Marvin D. Troutt. On the Generality of the PERT Average Time Formula , 1989 .
[11] Terry Williams,et al. Practical Use of Distributions in Network Analysis , 1992 .
[12] D. Keefer,et al. Better estimation of PERT activity time parameters , 1993 .