Risk Assessment for Ecological Planning of Arid Inland River Basins Under Hydrological and Management Uncertainties

The Shiyanghe river basin, an arid inland basin of northwest China, is taken as an example to analyze the risk for achieving the ecological planning objective in arid inland river basins under uncertainty conditions. Hydrology and management uncertainties that affect the accomplishment of ecological planning objective are analyzed quantitatively with the methods of Bayesian theory based Probabilistic model, scenario analysis and interval analysis. Bayesian probabilistic analysis method was used to analyze the hydrological uncertainties in the form of probability and interval distributions in planning period, while the scenario analysis method and interval method were used to analyze the managing uncertainties in the form of interval numbers. Instead of the ecological risk analysis, which for arid inland river basin, of studying the impact of environmental and human factor on ecological system, water resources and environment, we focused on analysing the possible impact of hydrological and management uncertainty factor on the ecological planning, and forecasting the degree of the completion under the uncertainty. Our study provided the probabilities of achieving ecological planning objective and the possible deviation of different scenarios. The more local water resources and higher level of local water resource utilization and management appeared to lead higher probability to achieve the ecological objective. This study can help environment and water resource managers and planner to formulate a rational planning for arid inland river basins under hydrological and management uncertainty.

[1]  Roman Krzysztofowicz,et al.  BAYESIAN MODELS OF FORECASTED TIME SERIES , 1985 .

[2]  Bruce K Hope,et al.  An assessment of anthropogenic source impacts on mercury cycling in the Willamette Basin, Oregon, USA. , 2006, The Science of the total environment.

[3]  L. Brocca,et al.  Fuzzy Logic for Rainfall-Runoff Modelling Considering Soil Moisture , 2015, Water Resources Management.

[4]  Y. Tung,et al.  Comparisons of Risk-based Decision Rules for the Application of Water Resources Planning and Management , 2014, Water Resources Management.

[5]  Dianjun Zhang,et al.  Risk assessment of water resources utilization in Songliao Basin of Northeast China , 2012, Environmental Earth Sciences.

[6]  Celeste Varum,et al.  Directions in scenario planning literature – A review of the past decades , 2010 .

[7]  M. Warne,et al.  Site‐specific probabilistic ecological risk assessment of a volatile chlorinated hydrocarbon‐contaminated tidal estuary , 2010, Environmental toxicology and chemistry.

[8]  Xibin Ji,et al.  The impact of the development of water resources on environment in arid inland river basins of Hexi region, Northwestern China , 2006 .

[9]  Ramon E. Moore,et al.  Interval analysis and fuzzy set theory , 2003, Fuzzy Sets Syst..

[10]  S. Giove,et al.  Integrated risk assessment for WFD ecological status classification applied to Llobregat river basin (Spain). Part I-Fuzzy approach to aggregate biological indicators. , 2011, The Science of the total environment.

[11]  D. Barceló,et al.  Analysis of the occurrence and risk assessment of polar pesticides in the Llobregat River Basin (NE Spain). , 2012, Chemosphere.

[12]  Lingling Li,et al.  A method based on interval-valued fuzzy soft set for multi-attribute group decision-making problems under uncertain environment , 2012, Knowledge and Information Systems.

[13]  Igor Linkov,et al.  Scenario and multiple criteria decision analysis for energy and environmental security of military and industrial installations , 2011, Integrated environmental assessment and management.

[14]  Ling Zhang,et al.  Modeling Land-Use and Land-Cover Change and Hydrological Responses under Consistent Climate Change Scenarios in the Heihe River Basin, China , 2015, Water Resources Management.

[15]  Dick de Zwart,et al.  Diagnosis of Ecosystem Impairment in a Multiple-Stress Context—How to Formulate Effective River Basin Management Plans , 2009, Integrated environmental assessment and management.

[16]  Ana Iglesias,et al.  Diagnosing Causes of Water Scarcity in Complex Water Resources Systems and Identifying Risk Management Actions , 2013, Water Resources Management.

[17]  Hongtao Bai,et al.  An inquiry into the potential of scenario analysis for dealing with uncertainty in strategic environmental assessment in China , 2011 .

[18]  Norman G. Loeb,et al.  Application of an Artificial Neural Network Simulation for Top-of-Atmosphere Radiative Flux Estimation from CERES , 2003 .

[19]  Ramon E. Moore Interval arithmetic and automatic error analysis in digital computing , 1963 .

[20]  Guohe Huang,et al.  Characterization and Evaluation of Elevation Data Uncertainty in Water Resources Modeling with GIS , 2008 .

[21]  E. Hansen Interval Arithmetic in Matrix Computations, Part I , 1965 .

[22]  Ralf Ludwig,et al.  Assessment and Management of Water Resources in Developing, Semi-arid and Arid Regions , 2012, Water Resources Management.

[23]  Roman Krzysztofowicz,et al.  Bayesian system for probabilistic river stage forecasting , 2002 .

[24]  Roman Krzysztofowicz,et al.  Bayesian theory of probabilistic forecasting via deterministic hydrologic model , 1999 .

[25]  A. Soldati,et al.  Artificial neural network approach to flood forecasting in the River Arno , 2003 .

[26]  B. Hope An examination of ecological risk assessment and management practices. , 2006, Environment international.

[27]  J. A. Gomez,et al.  Modelling the Rainfall-Runoff Relationships in a Large Olive Orchard Catchment in Southern Spain , 2015, Water Resources Management.

[28]  Fang Chuanglin,et al.  Mutual optimization of water utilization structure and industrial structure in arid inland river basins of Northwest China , 2006 .

[29]  Matthias Jarke,et al.  Scenario Management: An Interdisciplinary Approach , 1998, Requirements Engineering.

[30]  Guangtao Fu,et al.  Classified real-time flood forecasting by coupling fuzzy clustering and neural network , 2010 .

[31]  Rakesh Kapoor,et al.  Futuring: the exploration of the future, Edward Cornish. World Future Society, Bethesda, Maryland (2004), p. 300 , 2005 .

[32]  G. Suter Applicability of indicator monitoring to ecological risk assessment , 2001 .

[33]  Tommy S. W. Wong,et al.  Runoff forecasting for an asphalt plane by Artificial Neural Networks and comparisons with kinematic wave and autoregressive moving average models , 2011 .

[34]  Zhijia Li,et al.  Bayesian Statistic Forecasting Model for Middle-Term and Long-Term Runoff of a Hydropower Station , 2013 .

[35]  Frederick N.-F. Chou,et al.  Development and application of a decision group Back-Propagation Neural Network for flood forecasting. , 2010 .

[36]  William H. van der Schalie,et al.  A framework for ecological risk assessment at the EPA , 1992 .

[37]  Roman Krzysztofowicz,et al.  Hydrologic uncertainty processor for probabilistic river stage forecasting , 2000 .

[38]  E. Hansen,et al.  Interval Arithmetic in Matrix Computations, Part II , 1965 .

[39]  Zoran Kapelan,et al.  Comparing Low and High-Level Hybrid Algorithms on the Two-Objective Optimal Design of Water Distribution Systems , 2014, Water Resources Management.

[40]  Xi Chen,et al.  Effect of Land-Use Change and Artificial Recharge on the Groundwater in an Arid Inland River Basin , 2013, Water Resources Management.

[41]  Martin C. Thoms,et al.  An assessment of the ecological impacts of inter‐basin water transfers, and their threats to river basin integrity and conservation , 1992 .

[42]  Mustafa E. Üreyen,et al.  Comparison of artificial neural network and linear regression models for prediction of ring spun yarn properties. I. Prediction of yarn tensile properties , 2008 .

[43]  Xuesong Zhang,et al.  Bayesian Neural Networks for Uncertainty Analysis of Hydrologic Modeling: A Comparison of Two Schemes , 2012, Water Resources Management.

[44]  Guohe Huang,et al.  Achieving the objective of ecological planning for arid inland river basin under uncertainty based on ecological risk assessment , 2016, Stochastic Environmental Research and Risk Assessment.

[45]  M. Sivapalan,et al.  Effects of multiscale rainfall variability on flood frequency: Comparative multisite analysis of dominant runoff processes , 2008 .

[46]  Yonghua Zhu,et al.  A survey: obstacles and strategies for the development of ground-water resources in arid inland river basins of Western China , 2004 .

[47]  James H. Lambert,et al.  Integration of Decision Analysis and Scenario Planning for Coastal Engineering and Climate Change , 2011, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.

[48]  K. Fraedrich,et al.  Validation of an Ideal Rainfall-Runoff Chain in a GCM Environment , 2014, Water Resources Management.