Design guidelines for multiple-seam mining, Part II

The five types of interactions discussed in Part I are the major sources of ground control problems caused by multiple seam mining. These problems cannot be eliminated completely without sacrificing coal reserves. However, problems can be reduced if the interaction effects are fully understood and proper mining plans are implemented correctly. This work discusses methods and rules which can lead to better mining plans for a variety of geological and mining conditions.