A framework for identification and representation of client requirements in the briefing process

The briefing process is critical to the successful delivery of construction projects. Although a number of briefing guides have been developed, attempting to address the problems of briefing, they are often criticized as being too general and implicit. This paper describes a structured framework for identifying and representing client requirements (CRs) in the briefing process. It integrates the value management (VM) methodology with function analysis system technique (FAST) and functional performance specification (FPS) to enable the client organization and project team to systematically identify, clarify and clearly represent CRs in the briefing process. It comprises four interrelated phases: preparation, information, analysis and evaluation. This paper starts with a critical review of previous work in briefing and function analysis, followed by an introduction to the research methodology and detailed illustration of the proposed framework. The use of this framework can facilitate and lead to systematic identification and clarification of client requirements and the formation of a more precise and explicit representation of these requirements. The limitations of the approach are also discussed in the paper.

[1]  B. Berg Qualitative Research Methods for the Social Sciences , 1989 .

[2]  Stuart D. Green,et al.  Value management and post‐occupancy evaluation: closing the loop , 1998 .

[3]  Nick Baker,et al.  Energy and Environment in Architecture: A Technical Design Guide , 2000 .

[4]  John Kelly,et al.  Value Management in Design and Construction , 1993 .

[5]  Wolfgang F. E. Preiser,et al.  Programming the Built Environment , 1985 .

[6]  Kerry London,et al.  Construction Management: New Directions , 2002 .

[7]  William C. McElligott,et al.  Value Management in Construction , 1995 .

[8]  Elizabeth Agle,et al.  Building Air Quality: A Guide for Building Owners and Facility Managers. , 1991 .

[9]  Qiping Shen,et al.  A knowledge based structure for implementing Value Management in the design of office buildings , 1993 .

[10]  이승복 [권하는 책] Energy and Environment on Architecture / Nick Baker and Koen Steemers, E & FN Spon, London, 2000년 , 2003 .

[11]  Chimay J. Anumba,et al.  Process model for client requirements processing in construction , 2000, Bus. Process. Manag. J..

[12]  Peter Barrett,et al.  Better Construction Briefing , 1999 .

[13]  Donna P. Duerk,et al.  Architectural Programming: Information Management for Design , 1993 .

[14]  Stuart D. Green A SMART methodology for value management , 1992 .

[15]  Oscar Newman,et al.  Creating defensible space , 1996 .

[16]  William Peña,et al.  Problem Seeking: An Architectural Programming Primer , 1977 .

[17]  James Kent Associates Issue Management Handbook , 2002 .