A Bayesian Markov Model of the flood forecast process
暂无分享,去创建一个
[1] Edward S. Epstein,et al. A Bayesian Approach to Decision Making in Applied Meteorology , 1962 .
[2] Richard R. Nelson,et al. A Case Study in the Economics of Information and Coordination , 1964 .
[3] Walter T. Sittner,et al. Continuous hydrograph synthesis with an API‐type hydrologic model , 1969 .
[4] Walter T. Sittner. MODERNIZATION OF NATIONAL WEATHER SERVICE RIVER FORECASTING TECHNIQUES1 , 1973 .
[5] Robert L. Winkler,et al. A Bayesian Approach to Nonstationary Processes , 1973 .
[6] National Weather Service River Forecasting System , 1974 .
[7] Eric F. Wood,et al. A Bayesian approach to analyzing uncertainty among flood frequency models , 1975 .
[8] T. E. Unny,et al. Model uncertainty in flood frequency analysis and frequency‐based design , 1976 .
[9] Frank S. Conklin,et al. The Value of Frost Forecasting: A Bayesian Appraisal , 1976 .
[10] Walter T. Sittner. Determination of flood forecast effectiveness by the use of mean forecast lead time , 1977 .
[11] I. Bogardi,et al. Choice of distribution functions for hydrologic design , 1978 .
[12] A moisture-accounting watershed model for single-storm events based on time—Area concept , 1978 .
[13] Roman Krzysztofowicz. Why should a forecaster and a decision maker use Bayes Theorem , 1983 .
[14] Roman Krzysztofowicz,et al. A methodology for evaluation of flood forecast‐response systems: 3. Case studies , 1983 .
[15] Roman Krzysztofowicz,et al. A methodology for evaluation of flood forecast-response systems: 2. Theory , 1983 .
[16] Roman Krzysztofowicz,et al. A methodology for evaluation of flood forecast-response systems: 1. Analyses and concepts , 1983 .