A Bayesian Markov Model of the flood forecast process

A flood forecast process with a discrete time index k is defined as {i(k), h(k)}, where i denotes the current flood level and h denotes the forecasted flood crest. It is a finite, random duration process with the actual flood crest hh being its terminal state: {hh | i(k) h(k)}. This process is modeled as a two-branch Markov chain. Nonstationary transition probability functions are obtained from a Bayesian information processor which can be imbedded in a dynamic programing algorithm that solves an ensuing Markovian decision problem. The lead time and the processing time of the forecasts are represented by their certainty equivalents. The structure of the model is motivated by an analysis of historical flood forecast records. Methods of estimation of the prior probability and likelihood functions are described. The model is intended primarily as a component of a decision methodology for determining the economic value of and the optimal decisions in response to riverine flood forecasts.

[1]  Edward S. Epstein,et al.  A Bayesian Approach to Decision Making in Applied Meteorology , 1962 .

[2]  Richard R. Nelson,et al.  A Case Study in the Economics of Information and Coordination , 1964 .

[3]  Walter T. Sittner,et al.  Continuous hydrograph synthesis with an API‐type hydrologic model , 1969 .

[4]  Walter T. Sittner MODERNIZATION OF NATIONAL WEATHER SERVICE RIVER FORECASTING TECHNIQUES1 , 1973 .

[5]  Robert L. Winkler,et al.  A Bayesian Approach to Nonstationary Processes , 1973 .

[6]  National Weather Service River Forecasting System , 1974 .

[7]  Eric F. Wood,et al.  A Bayesian approach to analyzing uncertainty among flood frequency models , 1975 .

[8]  T. E. Unny,et al.  Model uncertainty in flood frequency analysis and frequency‐based design , 1976 .

[9]  Frank S. Conklin,et al.  The Value of Frost Forecasting: A Bayesian Appraisal , 1976 .

[10]  Walter T. Sittner Determination of flood forecast effectiveness by the use of mean forecast lead time , 1977 .

[11]  I. Bogardi,et al.  Choice of distribution functions for hydrologic design , 1978 .

[12]  A moisture-accounting watershed model for single-storm events based on time—Area concept , 1978 .

[13]  Roman Krzysztofowicz Why should a forecaster and a decision maker use Bayes Theorem , 1983 .

[14]  Roman Krzysztofowicz,et al.  A methodology for evaluation of flood forecast‐response systems: 3. Case studies , 1983 .

[15]  Roman Krzysztofowicz,et al.  A methodology for evaluation of flood forecast-response systems: 2. Theory , 1983 .

[16]  Roman Krzysztofowicz,et al.  A methodology for evaluation of flood forecast-response systems: 1. Analyses and concepts , 1983 .