Measuring Economic Impacts of Disasters: Interregional Input-Output Analysis Using Sequential Interindustry Model
暂无分享,去创建一个
[1] The phantom of the matrix: Inverting the case on closure in Cole's model , 1999 .
[2] A. Mas-Colell. The Theory Of General Economic Equilibrium , 1985 .
[3] Eliahu Romanoff,et al. Anticipatory and Responsive Sequential Interindustry Models , 1981, IEEE Transactions on Systems, Man, and Cybernetics.
[4] M. Morishima. Equilibrium, stability, and growth , 1964 .
[5] On the Complete Instability of Empirically Implemented Dynamic Leontief Models , 1990 .
[6] R. Bellman,et al. Linear Programming and Economic Analysis. , 1960 .
[7] CLOSURE IN COLE'S REFORMULATED LEONTIEF MODEL , 2005 .
[8] B. G. Jones. Economic Consequences of Earthquakes: Preparing for the Unexpected , 1997 .
[9] Jack E. Adams,et al. The Future Impact of Automation on Workers , 1987 .
[10] Stephanie E. Chang,et al. The Regional Economic Impact of an Earthquake: Direct and Indirect Effects of Electricity Lifeline Disruptions , 1997 .
[11] D. Szyld,et al. A DYNAMIC INPUT‐OUTPUT MODEL WITH ASSURED POSITIVE OUTPUT(*) , 2006 .
[12] R. Goodwin. Dynamical Coupling with Especial Reference to Markets Having Production Lags , 1947 .
[13] William M. Elliott,et al. Optimizing Post-Earthquake Lifeline System Reliability , 1999 .
[14] Enrico Zaghini. Solow Prices and the Dual Stability Paradox in the Leontief Dynamic System , 1971 .
[15] Stephanie E. Chang,et al. Linking Infrastructure and Urban Economy: Simulation of Water-Disruption Impacts in Earthquakes , 2002 .
[16] Sam Cole,et al. Expenditure Lags in Impact Analysis , 1989 .
[17] T. Mules. Some simulations with a sequential input-output model , 1983 .
[18] CLOSURE IN COLE'S REFORMULATED LEONTIEF MODEL: A Response to R. W. Jackson, M. Madden, and H. A. Bowman , 2005 .
[19] A. Steenge. Instability Problems in the Dynamic Leontief Model: an Economic Explanation , 1990 .
[20] Moss Madden,et al. Closing the case on closure in Cole's model , 1999 .
[21] W. Leontief. Studies in the Structure of the American Economy: Theoretical and Empirical Explorations in Input-Output Analysis , 1953 .
[22] Eliahu Romanoff,et al. Interindustry analysis for regional growth and development: The dynamics of manpower issues , 1984 .
[23] Geoffrey J. D. Hewings,et al. Economic Impacts of an Earthquake in the New Madrid Seismic Zone: A Multiregional Analysis , 1999 .
[24] Paulo Guimaraes,et al. Wealth And Income Effects Of Natural Disasters: An Econometric Analysis Of Hurricane Hugo , 1993 .
[25] Louis de Mesnard. The Asynchronous Leontief Model , 1992 .
[26] S H Levine,et al. Information, Interindustry Dynamics, and the Service Industries , 1993 .
[27] Carol Taylor West,et al. Modeling the Regional Impact of Natural Disaster and Recovery: A General Framework and an Application to Hurricane Andrew , 1994 .
[28] Thijs ten Raa,et al. Dynamic input-output analysis with distributed activities , 1986 .
[29] A. Nastasi,et al. Capital Usage and Output Growth in Multiregional Multisectoral Models: An Application to the Italian Case , 1993 .
[30] Sam Cole,et al. THE DELAYED IMPACTS OF PLANT CLOSURES IN A REFORMULATED LEONTIEF MODEL , 2005 .
[31] Stephen H. Levine,et al. TECHNICAL CHANGE IN PRODUCTION PROCESSES OF THE SEQUENTIAL INTERINDUSTRY MODEL , 1990 .
[32] A. Heesterman. The Instability of the Dynamic Input–Output Model , 1990 .
[33] D. Szyld. Conditions for the Existence of a Balanced Growth Solution for the Leontief Dynamic Input-Output Model , 1985 .
[34] A. Rose,et al. Engineering and Socioeconomic Impacts of Earthquakes , 1998 .
[35] Balanced Growth and Stability of the Leontief Dynamic Model: An Analysis of the Italian Economy , 1992 .
[36] Michael Sonis,et al. Economic Impacts of an Unscheduled, Disruptive Event: A Miyazawa Multiplier Analysis , 1999 .
[37] J. Forrester. Principles of systems : text and workbook, chapters 1 through 10 , 1968 .
[38] REGIONAL SCIENCE: RETROSPECT AND PROSPECT , 1966 .
[39] Lessons from the debate on Cole's model closure , 2000 .
[40] W. Leontief,et al. The Structure of American Economy, 1919-1939. , 1954 .
[41] Masanobu Shinozuka,et al. Integrating Transportation Network and Regional Economic Models to Estimate the Costs of a Large Urban Earthquake , 2001 .
[42] Stephen H. Levine,et al. CAPACITY LIMITATIONS, INVENTORY, AND TIME‐PHASED PRODUCTION IN THE SEQUENTIAL INTERINDUSTRY MODEL , 2005 .
[43] Eliahu Romanoff,et al. Economic impact dynamics of complex engineering project scheduling , 1989, IEEE Trans. Syst. Man Cybern..
[44] A. Schinnar. The Leontief Dynamic Generalized Inverse , 1978 .
[45] Jerome W. Milliman,et al. MEASURING THE REGIONAL ECONOMIC EFFECTS OF EARTHQUAKES AND EARTHQUAKE PREDICTIONS , 1984 .
[46] S. H. Levine,et al. Technical Change and Regional Development: Some Further Developments with the Sequential Interindustry Model , 1991 .
[47] Harry W. Richardson,et al. The business interruption effects of the Northridge earthquake , 1995 .
[48] Economic Impact of the Structural Changes of Production Technology: A Robust Approach , 1993 .