Dealing with customers enquiries simultaneously under contingent situation
暂无分享,去创建一个
[1] Kenneth R. Baker,et al. Sequencing Rules and Due-Date Assignments in a Job Shop , 1984 .
[2] Andi Cakravastia,et al. Model for negotiating the price and due date for a single order with multiple suppliers in a make-to-order environment , 2002 .
[3] Mohsen ElHafsi,et al. An Operational Decision Model for Lead-Time and Price Quotation in Congested Manufacturing Systems , 2000, Eur. J. Oper. Res..
[4] Liming Liu,et al. Pricing and Lead Time Decisions in Decentralized Supply Chains , 2007, Manag. Sci..
[5] Katsuhiko Takahashi,et al. Introducing quotation and negotiation structure in the order acceptance decision model , 2009 .
[6] A. Cakravastia,et al. Integrated Bidding and Manufacturing Planning Decisions with Contingent Orders in a Make-to-Order Environment , 2003 .
[7] Paul M. Griffin,et al. Pricing and scheduling decisions with leadtime flexibility , 2006, Eur. J. Oper. Res..
[8] Gary L. Ragatz,et al. A framework for the study of due date management in job shops , 1984 .
[9] D. R. Moodie. Due Date Demand Management : Negotiating the Trade-off Between Price and Delivery , 1999 .
[10] Douglas R. Moodie,et al. Pricing and lead time decisions for make-to-order firms with contingent orders , 1999, Eur. J. Oper. Res..
[11] Isa Nakhai Kamal Abadi,et al. Developing a two stage stochastic programming model of the price and lead-time decision problem in the multi-class make-to-order firm , 2011, Comput. Ind. Eng..
[12] Bunthit Watanapa,et al. A genetic algorithm for the multi-class contingent bidding model , 2005, OR Spectr..
[13] S. T Enns. An economic approach to job shop performance analysis , 1995 .
[14] Mehmet Bac,et al. On Creating and Claiming Value in Negotiations , 2001 .
[15] Stephen R. Lawrence,et al. Estimating flowtimes and setting due-dates in complex production systems , 1995 .
[16] Jwm Will Bertrand,et al. Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions , 2001 .
[17] Lawrence M. Wein,et al. Due-date Setting and Priority Sequencing in a Multiclass M/G/1 Queue , 2015 .
[18] R. Ravi,et al. Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues , 2001, Manag. Sci..
[19] Onur Kaya,et al. Scheduling and due‐date quotation in a make‐to‐order supply chain , 2008 .
[20] Peter Nijkamp,et al. Multi-Criteria Analysis and Regional Decision-Making , 1977 .
[21] Bunthit Watanapa,et al. Simultaneous price and due date settings for multiple customer classes , 2005, Eur. J. Oper. Res..
[22] Appa Iyer Sivakumar,et al. Scheduling and optimal delivery time quotation for customers with time sensitive demand , 2013 .
[23] J. Bertrand. The Effect of Workload Dependent Due-Dates on Job Shop Performance , 1983 .
[24] Susan A. Slotnick. Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size , 2011, Eur. J. Oper. Res..
[25] Donatella Corti,et al. Due date (DD) quotation and capacity planning inmake-to-order companies: results from an empirical analysis , 2008 .
[26] Donatella Corti,et al. A capacity-driven approach to establish reliable due dates in a MTO environment , 2006 .
[27] Suresh Chand,et al. A Single Machine Model for Determination of Optimal Due Dates and Sequence , 1992, Oper. Res..
[28] J. Shanthikumar,et al. Approximations for the time spent in a dynamic job shop with applications to due-date assignment , 1988 .
[29] Abraham Seidmann,et al. Due Date Assignment for Production Systems , 1981 .