Updating and validation of the dynamic model of a railway viaduct with precast deck
暂无分享,去创建一个
[1] L Frýba,et al. A rough assessment of railway bridges for high speed trains , 2001 .
[2] J. G. Macgregor,et al. Statistical Descriptions of Strength of Concrete , 1979 .
[3] Xinjie Yu,et al. Introduction to evolutionary algorithms , 2010, The 40th International Conference on Computers & Indutrial Engineering.
[4] Volkmar Zabel,et al. An automatic mode pairing strategy using an enhanced modal assurance criterion based on modal strain energies , 2010 .
[5] Klaus Knothe,et al. Receptance behaviour of railway track and subgrade , 1998 .
[6] Kai Liu,et al. Experimental and numerical analysis of a composite bridge for high-speed trains , 2009 .
[7] Raimundo Delgado,et al. Finite element model updating of a bowstring-arch railway bridge based on experimental modal parameters , 2012 .
[8] Filipe Magalhães,et al. Output-only dynamic testing of bridges and special structures , 2007 .
[9] Luís Simões da Silva,et al. Influence of ballast models in the dynamic response of railway viaducts , 2010 .
[10] Randall J. Allemang,et al. THE MODAL ASSURANCE CRITERION–TWENTY YEARS OF USE AND ABUSE , 2003 .
[11] Mario Paz,et al. Structural Dynamics: Theory and Computation , 1981 .
[12] Carlos Rebelo,et al. Dynamic behaviour of twin single-span ballasted railway viaducts — Field measurements and modal identification , 2008 .
[13] Benno Hoffmeister,et al. On the prediction of the interaction effect caused by continuous ballast on filler beam railway bridges by experimentally supported numerical studies , 2010 .