Interrelationships of factors causing delays in the relocation of utilities

Purpose – Relocation of utilities is a major source of delay in Indian infrastructure projects. This delay is particularly critical in road and bridge construction projects. The purpose of this paper is to identify the various factors and also the interrelationships between the factors which influence the delays in the relocation of utilities. Design/methodology/approach – Case studies were conducted on 11 road and bridge projects in India with varying levels of complexity and size. Factors causing relocation delays were identified using computer aided qualitative analysis methodology. Cognitive mapping technique was used to map the interrelationships between the factors and to identify the critical delay factors. Findings – Factors affecting delays were identified across two groups, namely, technical and organizational factors. The study offers insights into the kinds of interactions of factors that can lead to delays in a project. The critical factors causing delays were identified as slow response from...

[1]  Mohan Raj Manavazhi,et al.  Material and equipment procurement delays in highway projects in Nepal , 2002 .

[2]  M. Kishore Kumar,et al.  Time & cost overrun analysis of national highway development project , 2012 .

[3]  R. Yin Case Study Research: Design and Methods , 1984 .

[4]  Kumar Neeraj Jha,et al.  Critical determinants of project coordination , 2006 .

[5]  Neil S. Grigg New Paradigm for Coordination in Water Industry , 1993 .

[6]  Paul M. Goodrum,et al.  Case Study and Statistical Analysis of Utility Conflicts on Construction Roadway Projects and Best Practices in Their Avoidance , 2008 .

[7]  Anne Sigismund Huff,et al.  MAPS FOR MANAGERS: WHERE ARE WE? WHERE DO WE GO FROM HERE? , 1992 .

[8]  Wai-ming Chan,et al.  Modelling construction durations for public housing projects in Hong Kong , 1998 .

[9]  J. Swan Exploring Knowledge and Cognitions in Decisions About Technological Innovation: Mapping Managerial Cognitions , 1995 .

[10]  Mehmet Emre Bayraktar,et al.  Model for Analysis of Factors Affecting Construction Schedule in Highway Work Zones , 2006 .

[11]  Peter Barrett,et al.  Methodological strategies to gain insights into informality and emergence in construction project case studies , 2009 .

[12]  Prabal Roy Chowdhury Land acquisition: Political intervention, fragmentation and voice , 2013 .

[13]  Tommy Y. Lo,et al.  Construction Delays in Hong Kong Civil Engineering Projects , 2006 .

[14]  Carlos H. Caldas,et al.  Identification of Decision Drivers for the Strategy of Incorporating Utility Relocations into Highway Construction Contracts , 2009 .

[15]  Carlos H. Caldas,et al.  Negotiation‐based decision support model for utility relocations in transportation infrastructure projects , 2008 .

[16]  Terry Williams,et al.  Modelling Complex Projects , 2001 .

[17]  Ibrahim Mahamid,et al.  Risk matrix for factors affecting time delay in road construction projects: owners' perspective , 2011 .

[18]  C. Eden ON THE NATURE OF COGNITIVE MAPS , 1992 .

[19]  Anil Sawhney,et al.  Analysing factors affecting delays in Indian construction projects , 2012 .

[20]  Esra Kurul,et al.  The application of cognitive mapping methodologies in project management research , 2007 .

[21]  Terry Williams,et al.  The Need for New Paradigms for Complex Projects , 1999 .

[22]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[23]  Shishir Mathur,et al.  Use of land pooling and reconstitution for urban development: Experiences from Gujarat, India , 2013 .

[24]  Filippo A. Salustri,et al.  Cognitive mapping: Revealing the links between human factors and strategic goals in organizations , 2013 .

[25]  Bon-Gang Hwang,et al.  Identifying the critical factors affecting schedule performance of public housing projects , 2013 .

[26]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[27]  Fran Ackermann,et al.  The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects , 2000, J. Oper. Res. Soc..

[28]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[29]  Amund Bruland,et al.  Causes of Delay in Road Construction Projects , 2012 .

[30]  Yeun J. Jung,et al.  Evaluation of subsurface utility engineering for highway projects: Benefit–cost analysis , 2012 .

[31]  A. Sharma,et al.  Critical evaluation of road infrastructure in India: a cross‐country view , 2009 .