Cost performance for building construction projects in Klang Valley

Since seventies, the economic of Malaysia has undergone rapid growth. Construction industry constitutes an important element of Malaysian economy. It shows how important to control and manage the projects in good quality and efficiently. There are four fundamental constraints needed to be considered when managing the construction projects, which are scope, cost, time, and quality. In order to manage the projects successfully, it is necessary to consider whether the project is within those four constraints. However, it found that there were many problems on cost performance in many countries. One of the major problems was cost overrun in construction projects. In Malaysia, the problem of cost overrun considered significance in construction industry. There were many factors that contribute to cost overrun in Malaysian construction projects. The factors might become risks and lead to negative effect to the projects. Hence, this research is to identify factors that contribute to cost overrun and potential measures to overcome the problem with the focus given to construction projects within Klang Valley. The method used in this research is quantitative based. A questionnaire survey conducted to collect data from the respondents that consisted of project manager, quantity surveyor, M & E Engineer, C & S Engineer, and other related respondents. Questionnaires were distributed to 30 respondents from construction firms in Klang Valley. Data collected form a database for analysis using Statistic Package for Social Sciences (SPSS) version 17.0. Descriptive statistics and ranking analysis were used in data analysis. The result shown that the most serious factor contributes to cost overrun was inaccurate or poor estimation of original cost and the factor do not affect most was mistake in design. The most important method to control construction cost is proper project costing and financing. On the other hand, the least important approach was establishing a system in design. In conclusion, the problem of cost overrun is not a small issue but could cause serious problems to the construction industry in Malaysia.

[1]  W J Angelo,et al.  MEGAPROJECTS NEED MORE STUDY UP FRONT TO AVOID COST OVERRUNS , 2002 .

[2]  Stephen O. Ogunlana,et al.  A study on project success factors in large construction projects in Vietnam , 2004 .

[3]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[4]  Srinath Perera,et al.  Cost Studies of Buildings , 2004 .

[5]  James P. Clements,et al.  Successful Project Management , 1999 .

[6]  Long Le-Hoai,et al.  Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .

[7]  Fetene Nega CAUSES AND EFFECTS OF COST OVERRUN ON PUBLIC BUILDING CONSTRUCTION PROJECTS IN ETHIOPIA , 2008 .

[8]  Frederick E. Gould Managing the Construction Process: Estimating, Scheduling, and Project Control , 1996 .

[9]  Moonseo Park,et al.  Project cost estimation using principal component regression , 2005 .

[10]  W. Peeters,et al.  A proposed strategy against cost overruns in the space sector: The 5C approach , 2008 .

[11]  F. Harrison,et al.  Advanced project management , 1980 .

[12]  Albert P.C. Chan Time–cost relationship of public sector projects in Malaysia , 2001 .

[13]  Ivars Avotos,et al.  Cost-relevance analysis for overrun control , 1983 .

[14]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[15]  Paul. Olomolaiye,et al.  A survey of site management practice on some selected sites in Nigeria , 1989 .