Engineering Change Management in the Engineer-to-Order Production Environment: Insights from Two Case Studies

Engineering changes (ECs) are part of any Engineer-to-order (ETO) project. The engineering change management (ECM) literature provides various tools, methods and best practices, and this study investigates ECM practices in the ETO production environment. Through two exploratory case studies, we identify five main ECM challenges; EC impact analysis, EC data management, internal and external collaboration and communication, and EC post-implementation review. Both companies have implemented the main ECM steps recommended in literature but there are considerable weaknesses in the execution of the post-implementation review process. More ETO cases are needed to confirm the findings and investigate how ECM tools and approaches vary by different dimensions.

[1]  Claudia Eckert,et al.  Engineering change: an overview and perspective on the literature , 2011 .

[2]  P. John Clarkson,et al.  A Holistic Categorization Framework for Literature on Engineering Change Management , 2013, Syst. Eng..

[3]  Soo-Hong Lee,et al.  An integrated engineering change management process model for a project-based manufacturing , 2015, Int. J. Comput. Integr. Manuf..

[4]  Bhuiyan Nadia,et al.  Engineering change request management in a new product development process , 2006 .

[5]  Thomas Ditlev Brunoe,et al.  Towards an engineering change management maturity grid , 2016 .

[6]  Rossitza Setchi,et al.  Assessing the challenges of managing product design change through-life , 2016 .

[7]  Claudia Eckert,et al.  Engineering change: drivers, sources and approaches in industry , 2009 .

[8]  Pallav Gupta,et al.  Effect of sintering on wear characteristics of Fe-Al2O3 metal matrix composites , 2014 .

[9]  B MilesMatthew,et al.  Qualitative Data Analysis , 2009, Approaches and Processes of Social Science Research.

[10]  I. C. Wright,et al.  A review of research into engineering change management: implications for product design , 1997 .

[11]  Jan Ola Strandhagen,et al.  Managing engineering changes in the engineer-to-order environment: challenges and research needs , 2018 .

[12]  Euthemia Stavrulaki,et al.  Aligning products with supply chain processes and strategy , 2010 .

[13]  Peter E. D. Love,et al.  A system dynamics model for assessing the impacts of design errors in construction projects , 2013, Math. Comput. Model..

[14]  Jwm Will Bertrand,et al.  Production control in engineer-to-order firms , 1993 .

[15]  Jan Ola Strandhagen,et al.  Strategies for customized shipbuilding with different customer order decoupling points , 2014 .