Challenges of UK/Irish contractors regarding material management and logistics in confined site construction

The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

[1]  Phil Jones,et al.  Urban regeneration in the UK , 2013 .

[2]  John P. Spillane,et al.  Confined site construction: A qualitative investigation of critical issues affecting management of health and safety , 2011 .

[3]  Graham Winch,et al.  Managing Construction Projects , 2009 .

[4]  Robert Home,et al.  Land ownership in the United Kingdom: Trends, preferences and future challenges , 2009 .

[5]  T. Dixon Urban land and property ownership patterns in the UK: trends and forces for change☆ , 2009 .

[6]  Yasser Mohamed,et al.  Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance , 2009 .

[7]  Mohammad A. Ammar,et al.  Optimal Construction Site Layout Considering Safety and Environmental Aspects , 2008 .

[8]  O. O. Ugwu,et al.  Modelling construction material logistics system with stochastic Petri nets , 2008 .

[9]  Wu Chen,et al.  Positioning and tracking construction vehicles in highly dense urban areas and building construction sites , 2007 .

[10]  Scott Fernie,et al.  Exploring change in construction: supply chain management , 2007 .

[11]  N. Grimm,et al.  Development of a framework for quantifying the environmental impacts of urban development and construction practices. , 2007, Environmental science & technology.

[12]  C. P. Nathanail,et al.  The challenge of sustainability: incentives for brownfield regeneration in Europe , 2007 .

[13]  Chimay J. Anumba,et al.  Potential for improving site management practices through knowledge management , 2006 .

[14]  Sunil K. Sinha,et al.  Fundamental Principles for Avoiding Congested Work Areas—A Case Study , 2006 .

[15]  Timo Ala-Risku,et al.  Material delivery problems in construction projects: A possible solution , 2006 .

[16]  Carlos H. Caldas,et al.  Tracking the Location of Materials on Construction Job Sites , 2006 .

[17]  Ronie Navon,et al.  An automated model for materials management and control , 2006 .

[18]  Graham Winch,et al.  Critical Space Analysis , 2006 .

[19]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[20]  Moonseo Park,et al.  Effects of schedule pressure on construction performance , 2006 .

[21]  Awad S. Hanna,et al.  QUANTIFYING THE IMPACT OF SCHEDULE COMPRESSION ON CONSTRUCTION LABOR PRODUCTIVITY , 2005 .

[22]  Maged Georgy,et al.  LAYOUT PLANNING OF CONSTRUCTION SITES CONSIDERING MULTIPLE OBJECTIVES: A GOAL- PROGRAMMING APPROACH , 2005 .

[23]  Gregory A. Howell,et al.  Accident Prevention Strategies: Causation Model and Research Directions , 2005 .

[24]  H. Randolph Thomas,et al.  Role of Inventory Buffers in Construction Labor Performance , 2005 .

[25]  David R. Riley,et al.  Fundamental principles of site material management , 2005 .

[26]  Jimmie Hinze,et al.  Theft and Vandalism on Construction Sites , 2005 .

[27]  Gregory A. Howell,et al.  Systems Model of Construction Accident Causation , 2005 .

[28]  Liang Yong,et al.  Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency , 2005 .

[29]  A. R. Soltani,et al.  A fuzzy based multi-objective path planning of construction sites , 2004 .

[30]  Bambang Trigunarsyah,et al.  Constructability Practices among Construction Contractors in Indonesia , 2004 .

[31]  Chi Sun Poon,et al.  Management of construction waste in public housing projects in Hong Kong , 2004 .

[32]  Tarek Hegazy,et al.  DYNAMIC LAYOUT OF CONSTRUCTION TEMPORARY FACILITIES CONSIDERING SAFETY , 2004 .

[33]  Kwok-wing Chau,et al.  Four-dimensional visualization of construction scheduling and site utilization , 2004 .

[34]  Chi Sun Poon,et al.  Reducing building waste at construction sites in Hong Kong , 2004 .

[35]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[36]  Jeffrey S. Russell,et al.  A project manager's level of satisfaction in construction logistics , 2003 .

[37]  H. Laitinen,et al.  Accidents in materials handling at construction sites , 2003 .

[38]  Jimmie Hinze,et al.  Analysis of Construction Worker Fall Accidents , 2003 .

[39]  David J. Edwards,et al.  A fuzzy logic decision support system for routing materials on construction sites , 2003 .

[40]  Graham Winch,et al.  Managing Construction Projects: An Information Processing Approach , 2002 .

[41]  Saad H.S. Al-Jibouri,et al.  GENETIC ALGORITHMS FOR CONSTRUCTION SITE LAYOUT IN PROJECT PLANNING , 2002 .

[42]  Lucio Soibelman,et al.  Material Waste in Building Industry: Main Causes and Prevention , 2002 .

[43]  Arthur W. T. Leung,et al.  Site layout planning using nonstructural fuzzy decision support system , 2002 .

[44]  Dennis W. Krumwiede,et al.  The relationship of logistics to supply chain management: developing a common industry definition , 2001, Ind. Manag. Data Syst..

[45]  M. Anson,et al.  A procedure for quantitatively evaluating site layout alternatives , 2001 .

[46]  Gary David Holt,et al.  Reducing construction costs: European best practice supply chain implications , 2000 .

[47]  Lauri Koskela,et al.  The four roles of supply chain management in construction , 2000 .

[48]  Peter E.D. Love,et al.  Quantifying the causes and costs of rework in construction , 2000 .

[49]  Paul Drewe,et al.  Urban Regeneration, a handbook , 2000 .

[50]  Lauri Koskela,et al.  Management of production in construction: A theoretical view , 1999 .

[51]  Damodara U. Kini Materials Management: The Key to Successful Project Management , 1999 .

[52]  B. Mulholland,et al.  Risk Assessment in Construction Schedules , 1999 .

[53]  Iris D. Tommelein,et al.  Space Scheduling Using Flow Analysis , 1999 .

[54]  Lauri Koskela,et al.  Roles of supply chain management in construction , 1999 .

[55]  Gino Marchet,et al.  Project logistics: integrating the procurement and construction processes , 1998 .

[56]  George Norman,et al.  The role of logistics in the materials flow control process , 1998 .

[57]  T. Vainio,et al.  Well-being through construction , 1997 .

[58]  John Byrne,et al.  The challenge of sustainability: Balancing China's energy, economic and environmental goals , 1996 .

[59]  Hjh Jos Brouwers,et al.  Construction Waste: Quantification and Source Evaluation , 1996 .

[60]  Adnan Enshassi,et al.  Materials control and waste on building sites : Data in the study was obtained from 86 housing projects on several locations in the Gaza Strip , 1996 .

[61]  H. N. Ahuja,et al.  Project management : techniques in planning and controlling construction projects / Hira N. Ahuja, S.P. Dozzi, S.M. Aourizk , 1994 .

[62]  G. D. Holt,et al.  Factors influencing U.K. construction clients' choice of contractor , 1994 .

[63]  Iris D. Tommelein,et al.  Interactive Dynamic Layout Planning , 1993 .

[64]  David W. Orr The challenge of sustainability , 1993 .

[65]  H. Randolph Thomas,et al.  Factors Affecting Masonry‐Labor Productivity , 1991 .

[66]  S. Male,et al.  Strategic Management in Construction , 1991 .

[67]  Iris D. Tommelein,et al.  SightPlan Experiments: Alternate Strategies for Site Layout Design , 1991 .

[68]  H. Randolph Thomas,et al.  Impact of Material Management on Productivity—A Case Study , 1989 .

[69]  Roy Chudley,et al.  Building Construction Handbook , 1988 .

[70]  H. W. Parker,et al.  Productivity improvement in construction , 1988 .

[71]  Lansford C. Bell,et al.  Costs and benefits of materials management systems , 1987 .

[72]  G. B. Simon,et al.  Causes and Prevention , 1978 .

[73]  J. Davy Land Use in Britain , 1955, Nature.