Use of multicriteria analysis (MCA) for sustainable hydropower planning and management.
暂无分享,去创建一个
Claudio Comoglio | Erica Vassoney | Andrea Mammoliti Mochet | C. Comoglio | Erica Vassoney | Andrea Mammoliti Mochet
[1] Burak Omer Saracoglu. An Experimental Research Study on the Solution of a Private Small Hydropower Plant Investments Selection Problem by ELECTRE III/IV, Shannon's Entropy, and Saaty's Subjective Criteria Weighting , 2015, Adv. Decis. Sci..
[2] Marta Carla Bottero,et al. Integrating multicriteria evaluation and stakeholders analysis for assessing hydropower projects , 2014 .
[3] Serhat Kucukali,et al. Environmental risk assessment of small hydropower (SHP) plants: A case study for Tefen SHP plant on Filyos River , 2014 .
[4] Bojan Srdjevic,et al. Modelling Multicriteria Decision Making Process for Sharing Benefits from the Reservoir at Serbia-Romania Border , 2014, Water Resources Management.
[5] David J. Pannell,et al. Sensitivity Analysis of Normative Economic Models: Theoretical Framework and Practical Strategies , 1997 .
[6] E. Garofalo,et al. Implementation of a multi criteria analysis for the definition of environmental flow from hydroelectric diversions within an IWRM (integrated water resources management) framework , 2011 .
[7] Risako Morimoto,et al. Incorporating socio-environmental considerations into project assessment models using multi-criteria analysis: A case study of Sri Lankan hydropower projects , 2013 .
[8] Manish Kumar Goyal,et al. Geospatial and hydrological modeling to assess hydropower potential zones and site location over rainfall dependent Inland catchment , 2015, Water Resources Management.
[9] Salem Chakhar,et al. Spatial multicriteria decision making , 2008 .
[10] Serhat Kucukali. Risk assessment of river-type hydropower plants using fuzzy logic approach , 2011 .
[11] C. Comoglio,et al. Modelling habitat requirements of bullhead (Cottus gobio) in Alpine streams , 2013, Aquatic Sciences.
[12] Ulla Mörtberg,et al. A Spatial Multi-Criteria Analysis Approach for Locating Suitable Sites for Construction of Subsurface Dams in Northern Pakistan , 2014, Water Resources Management.
[13] Ali Ghaffari,et al. Sequential quadratic programming and analytic hierarchy process for nonlinear multiobjective optimization of a hydropower network , 2010 .
[14] Svetlana Stevovic,et al. Sustainable Management of Water Resources in Prokletije Region 5 , 2014 .
[15] E. Alameda-Hernandez,et al. Optimal site selection for upper reservoirs in pump-back systems, using geographical information systems and multicriteria analysis , 2016 .
[16] Wei Sun,et al. Risk assessment of hydropower stations through an integrated fuzzy entropy-weight multiple criteria decision making method: A case study of the Xiangxi River , 2015, Expert Syst. Appl..
[17] Hans Peter Nachtnebel,et al. Analytical hierarchy process (AHP) application for reinforcement of hydropower strategy in Nepal , 2016 .
[18] Asis Mazumdar,et al. MULTI-DIMENSIONAL FEASIBILITY ANALYSIS OF SMALL HYDROPOWER PROJECT IN INDIA: A CASE STUDY , 2014 .
[19] Paolo Vezza,et al. Habitat modeling in high-gradient streams: the mesoscale approach and application. , 2014, Ecological applications : a publication of the Ecological Society of America.
[20] Angela H. Arthington,et al. Environmental flow requirements of fish in Lesotho rivers using the DRIFT methodology , 2003 .
[21] Anibal T. de Almeida,et al. Multi-impact evaluation of new medium and large hydropower plants in Portugal centre region , 2005 .
[22] José Luis Fuentes-Bargues,et al. Selecting a small run-of-river hydropower plant by the analytic hierarchy process (AHP): A case study of Miño-Sil river basin, Spain , 2015 .
[23] Fausto A. Canales,et al. Prioritizing small hydropower projects in scenarios with limited financial resources , 2014 .
[24] Franci Steinman,et al. Hydropower Suitability Analysis on a Large Scale Level: Inclusion of a Calibration Phase to Support Determination of Model Parameters , 2014, Water Resources Management.
[25] Mario Luis Chew Hernández,et al. A framework for the optimal multicriteria design of networks of small hydro turbines in polluted streams , 2015 .
[26] Ching-Lai Hwang,et al. Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.
[27] Ioan Nistor,et al. Efficiency assessment of hydroelectric power plants in Canada: A multi criteria decision making approach , 2014 .
[28] Yohay Carmel,et al. Uses and Misuses of Multicriteria Decision Analysis (MCDA) in Environmental Decision Making , 2009, Risk analysis : an official publication of the Society for Risk Analysis.
[29] Youwei Qin,et al. Optimization of habitat protection area based on analytic hierarchy process (AHP) at Chongqing Reach in Wujiang Basin , 2011, 2011 International Conference on Remote Sensing, Environment and Transportation Engineering.
[30] Simo Sarkki,et al. Integrating ecosystem services into environmental impact assessment: An analytic–deliberative approach , 2013 .
[31] Liu Dan,et al. A Study on the Integrated MSW Management Technologies of Work Zone in the Hydropower Station of Yangtze Basin , 2011, 2011 International Conference on Computer Distributed Control and Intelligent Environmental Monitoring.
[32] S. Larson. Index-based tool for preliminary ranking of social and environmental impacts of hydropower and storage reservoirs , 2007 .
[33] Bo Sun,et al. Risk identification on hydropower project using the IAHP and extension of TOPSIS methods under interval-valued fuzzy environment , 2012, Natural Hazards.
[34] Guillermo A. Mendoza,et al. Multi-criteria decision analysis in natural resource management: A critical review of methods and new modelling paradigms , 2006 .
[35] Thana Boonyasirikul,et al. Hydropower development priority using MCDM method , 2009 .
[36] M. Alberti,et al. Un metodo multi criterio per la stima della portata di progetto di centrali idroelettriche ad acqua fluente , 2004 .
[37] R. L. Keeney,et al. Decisions with Multiple Objectives: Preferences and Value Trade-Offs , 1977, IEEE Transactions on Systems, Man, and Cybernetics.
[38] Hongying Zhang,et al. Approaches to group decision making with incomplete information based on power geometric operators and triangular fuzzy AHP , 2015, Expert Syst. Appl..
[39] Ca Brown,et al. Using multicriteria analysis to develop environmental flow scenarios for rivers targeted for water resource management , 2004 .
[40] T. Saaty,et al. The Analytic Hierarchy Process , 1985 .
[41] M. H. Alipour,et al. Risk-Informed Decision Making Framework for Operating a Multi-Purpose Hydropower Reservoir During Flooding and High Inflow Events, Case Study: Cheakamus River System , 2015, Water Resources Management.
[42] Serhat Kucukali,et al. Finding the most suitable existing hydropower reservoirs for the development of pumped-storage schemes: An integrated approach , 2014 .
[43] Helena Alegre,et al. Multi-criteria Analysis for the Selection of the Best Energy Efficient Option in Urban Water Systems , 2014 .
[44] A. John Sinclair,et al. Perceptions of impacts, public participation, and learning in the planning, assessment and mitigation of two hydroelectric projects in Uttarakhand, India , 2013 .
[45] Mika Marttunen,et al. Participatory and multiobjective development of watercourse regulation—creation of regulation alternatives from stakeholders' preferences , 2005 .
[46] S. S. Katoch,et al. Sustainability assessment and ranking of run of the river (RoR) hydropower projects using analytical hierarchy process (AHP): A study from Western Himalayan region of India , 2015, Journal of Mountain Science.
[47] Timothy R. Anderson,et al. Exploring the impact of technology development and adoption for sustainable hydroelectric power and , 2010 .
[48] MULTI-CRITERIA RESERVOIR WATER MANAGEMENT , 2005 .
[49] D. He,et al. A new assessment method for comprehensive impact of hydropower development on runoff and sediment changes , 2012, Journal of Geographical Sciences.
[50] Branko Vucijak,et al. Applicability of multicriteria decision aid to sustainable hydropower , 2013 .
[51] Jean-Louis Boillat,et al. Decision Support System for the hydropower plants management: the MINERVE project , 2011 .
[52] Luciane Neves Canha,et al. Real‐Time Reconfiguration of Distribution Network with Distributed Generation , 2014 .