Energy-Efficient Scheduling Problem Using an Effective Hybrid Multi-Objective Evolutionary Algorithm
暂无分享,去创建一个
Liang Gao | Chao Lu | Xinyu Li | Lvjiang Yin | Xinyu Li | Liang Gao | Chao Lu | Lvjiang Yin
[1] Mitsuo Gen,et al. Multi-objective multi-population biased random-key genetic algorithm for the 3-D container loading problem , 2015, Comput. Ind. Eng..
[2] Gunther Reinhart,et al. Energy-orientated Machine Scheduling for Hybrid Flow Shops☆ , 2015 .
[3] L. J. Eshelman,et al. chapter Real-Coded Genetic Algorithms and Interval-Schemata , 1993 .
[4] Massimo Paolucci,et al. Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops , 2012 .
[5] Andreas C. Nearchou,et al. Scheduling with controllable processing times and compression costs using population-based heuristics , 2010 .
[6] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[7] Alistair Duffy,et al. Lean Cables ? A Step towards Competitive, Sustainable and Profitable Processes , 2014 .
[8] Christian Gahm,et al. Energy-oriented scheduling based on Evolutionary Algorithms , 2015, Comput. Oper. Res..
[9] Jorge M. S. Valente. Beam search heuristics for quadratic earliness and tardiness scheduling , 2010, J. Oper. Res. Soc..
[10] Mehmet Bayram Yildirim,et al. Single-Machine Sustainable Production Planning to Minimize Total Energy Consumption and Total Completion Time Using a Multiple Objective Genetic Algorithm , 2012, IEEE Transactions on Engineering Management.
[11] W. Spears,et al. On the Virtues of Parameterized Uniform Crossover , 1995 .
[12] Fengxing Zou,et al. Mathematical model and genetic optimization for hybrid flow shop scheduling problem based on energy consumption , 2008, 2008 Chinese Control and Decision Conference.
[13] Jorge M. S. Valente,et al. Beam search algorithms for the early/tardy scheduling problem with release dates , 2005 .
[14] Lin Lin,et al. Multiobjective evolutionary algorithm for manufacturing scheduling problems: state-of-the-art survey , 2014, J. Intell. Manuf..
[15] Ming Zhou,et al. Optimizing green production strategies: An integrated approach , 2013, Comput. Ind. Eng..
[16] Sanja Petrovic,et al. An investigation into minimising total energy consumption and total weighted tardiness in job shops , 2014 .
[17] Mehmet Fatih Tasgetiren,et al. A hybrid harmony search algorithm for the blocking permutation flow shop scheduling problem , 2011, Comput. Ind. Eng..
[18] Axel Tuma,et al. Energy-efficient scheduling in manufacturing companies: A review and research framework , 2016, Eur. J. Oper. Res..
[19] John W. Sutherland,et al. A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction , 2011 .
[20] Qingfu Zhang,et al. MOEA/D: A Multiobjective Evolutionary Algorithm Based on Decomposition , 2007, IEEE Transactions on Evolutionary Computation.
[21] Aimin Zhou,et al. A Multiobjective Evolutionary Algorithm Based on Decomposition and Preselection , 2015, BIC-TA.
[22] Fei Liu,et al. A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan , 2005 .
[23] Mostafa Zandieh,et al. A genetic algorithm for JIT single machine scheduling with preemption and machine idle time , 2011, Expert Syst. Appl..
[24] Kenneth R. Baker,et al. Minimizing earliness and tardiness costs in stochastic scheduling , 2014, Eur. J. Oper. Res..
[25] Xin Yao,et al. Mathematical modeling and multi-objective evolutionary algorithms applied to dynamic flexible job shop scheduling problems , 2015, Inf. Sci..
[26] John W. Sutherland,et al. Flow shop scheduling with peak power consumption constraints , 2013, Ann. Oper. Res..
[27] Liang Gao,et al. Energy-efficient multi-pass turning operation using multi-objective backtracking search algorithm , 2016 .
[28] Mehmet Bayram Yildirim,et al. A framework to minimise total energy consumption and total tardiness on a single machine , 2008 .
[29] Candace Arai Yano,et al. Algorithms for a class of single-machine weighted tardiness and earliness problems , 1991 .
[30] Adriana Giret,et al. Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm , 2013 .
[31] Kalyanmoy Deb,et al. Simulated Binary Crossover for Continuous Search Space , 1995, Complex Syst..
[32] Marco Laumanns,et al. SPEA2: Improving the Strength Pareto Evolutionary Algorithm For Multiobjective Optimization , 2002 .
[33] Shigeru Fujimura,et al. Dynamic routing strategies for JIT production in hybrid flow shops , 2012, Comput. Oper. Res..
[34] Jagadish Jampani,et al. A moving block heuristic for minimizing earliness and tardiness on a single machine with unrestrictive common due dates , 2005 .
[35] Mitsuo Gen,et al. Effective multiobjective EDA for bi-criteria stochastic job-shop scheduling problem , 2017, J. Intell. Manuf..
[36] C. Coello,et al. Improving PSO-based Multi-Objective Optimization using Crowding , Mutation and �-Dominance , 2005 .
[37] Cheng-Hsiang Liu,et al. Approximate trade-off between minimisation of total weighted tardiness and minimisation of carbon dioxide (CO2) emissions in bi-criteria batch scheduling problem , 2014, Int. J. Comput. Integr. Manuf..
[38] Abel García-Nájera,et al. An evolutionary approach for multi-objective vehicle routing problems with backhauls , 2015, Comput. Ind. Eng..
[39] Lawrence E. Whitman,et al. Data collection framework on energy consumption in manufacturing , 2006 .
[40] Timothy G. Gutowski,et al. An Environmental Analysis of Machining , 2004 .
[41] Janet M. Twomey,et al. Operational methods for minimization of energy consumption of manufacturing equipment , 2007 .
[42] Iraj Mahdavi,et al. A drastic hybrid heuristic algorithm to approach to JIT policy considering controllable processing times , 2013 .
[43] Guohui Zhang,et al. Dynamic rescheduling in FMS that is simultaneously considering energy consumption and schedule efficiency , 2016 .
[44] Iraj Mahdavi,et al. Single machine scheduling with controllable processing times to minimize total tardiness and earliness , 2013, Comput. Ind. Eng..
[45] Abdelhakim Artiba,et al. Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance , 2014, Comput. Oper. Res..
[46] Dvir Shabtay,et al. The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times , 2008, Ann. Oper. Res..
[47] Joaquín B. Ordieres Meré,et al. Optimizing the production scheduling of a single machine to minimize total energy consumption costs , 2014 .
[48] A. Verl,et al. ENERGY CONSUMPTION FORECASTING AND OPTIMISATION FOR TOOL MACHINES , 2009 .
[49] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[50] George Q. Huang,et al. Hybrid flow shop scheduling considering machine electricity consumption cost , 2013 .
[51] Safia Kedad-Sidhoum,et al. A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem , 2008, J. Sched..
[52] Liang Gao,et al. An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem , 2009, Comput. Ind. Eng..
[53] Quan-Ke Pan,et al. Pareto-based grouping discrete harmony search algorithm for multi-objective flexible job shop scheduling , 2014, Inf. Sci..