Hardware-in-the-loop testing of bypass valve actuation system: Design and validation of a simplified real time model

During the start-up and shut-down phases of steam power plants many components are subjected to pressure and temperature transients that have to be carefully regulated both for safety and reliability reasons. For this reason, there is a growing interest in the optimization of turbine bypass controllers and actuators which are mainly used to regulate the plant during this kind of operations. In this work, a numerically efficient model for real-time simulation of a steam plant is presented. In particular, a modular Simulink™ library of components such as valves, turbines, and heaters has been developed. In this way, it is possible to easily assemble and customize models able to simulate different plants and operating scenarios. The code, which is implemented for a fixed, discrete step solver, can be easily compiled for a RT target (such as a Texas Instrument DSP) in order to be executed in real time on a low-cost industrial hardware. The proposed model has been used for quite innovative applications such as the development of a hardware-in-the-loop test rig of turbine bypass controllers and valve positioners. Preliminary experimental activities and results of the proposed test rig developed for Velan ABV are introduced and discussed.

[1]  Amitava Gupta,et al.  Optimal control strategy for minimization of exergy destruction in boiler superheater , 2013 .

[2]  Ali Ghaffari,et al.  Thermodynamic modeling based optimization for thermal systems in heat recovery steam generator during cold start-up operation , 2014 .

[3]  Jong-Rong Wang,et al.  On study of steam bypass and pressure control system for Lungmen nuclear power plant , 2011 .

[4]  Wen Bao,et al.  Bumpless switching scheme design for continuous-time controller switched systems , 2011, Proceedings of the 30th Chinese Control Conference.

[5]  E. Zaev,et al.  Hydro power plant governor testing using hardware-in-the-loop simulation , 2012, 2012 Mediterranean Conference on Embedded Computing (MECO).

[6]  Ali Ghaffari,et al.  Steam turbine model , 2008, Simul. Model. Pract. Theory.

[7]  Paul Crolla,et al.  European White Book on Real-Time Power Hardware in the Loop Testing : DERlab Report No. R- 005.0 , 2012 .

[8]  Monica Malvezzi,et al.  A scaled roller test rig for high-speed vehicles , 2010 .

[9]  R. S. Amano,et al.  High-Pressure Steam Flow in Turbine Bypass Valve System Part 1: Valve Flow , 2002 .

[10]  J. Warner,et al.  Combined - Cycle Gas & Steam Turbine Power Plants , 1999 .

[11]  Alan V. Oppenheim,et al.  Discrete-time Signal Processing. Vol.2 , 2001 .

[12]  Ali Ghaffari,et al.  Cold start-up condition model for heat recovery steam generators , 2014 .

[13]  Francesco Casella,et al.  Fast Start-up of a Combined-Cycle Power Plant: a Simulation Study with Modelica , 2006 .

[14]  R. Franke,et al.  Optimal control for fast boiler start-up based on a nonlinear model and considering the thermal stress on thick-walled components , 2001, Proceedings of the 2001 IEEE International Conference on Control Applications (CCA'01) (Cat. No.01CH37204).

[15]  John F. Gardner,et al.  Dynamic Modeling and Control of Engineering Systems , 2007 .

[16]  Q. Chou,et al.  Design and Dynamic Performance of a Steam Turbine Bypass Control System for a Large Fossil-Fired Power Generating Unit , 1979, IEEE Transactions on Power Apparatus and Systems.

[17]  Karl Johan Åström,et al.  Drum-boiler dynamics , 2000, Autom..

[18]  Didier Dumur,et al.  An optimization procedure of the start-up of Combined Cycle Power Plants , 2011 .

[19]  Yang Lin,et al.  The research of thermal design for vehicle controller based on simulation , 2013 .

[20]  Monica Malvezzi,et al.  Feasibility of degraded adhesion tests in a locomotive roller rig , 2008 .

[21]  Bruno Facchini,et al.  A numerical method for power plant simulations , 1996 .

[22]  José Luis Guzmán,et al.  Bumpless switching in control - A comparative study , 2010, 2010 IEEE 15th Conference on Emerging Technologies & Factory Automation (ETFA 2010).

[23]  Bruno Facchini,et al.  Modular approach to analysis of chemically recuperated gas turbine cycles , 1998 .

[24]  Edwin Gobrecht,et al.  Advanced Steam Turbine Bypass Valve Design for Flexible Power Plants , 2002 .

[25]  Le Wei,et al.  Backstepping-based nonlinear adaptive control for coal-fired utility boiler–turbine units , 2011 .

[26]  Carlo Carcasci,et al.  Design issues for the methane-steam reformer of a chemically recuperated gas turbine cycle , 1998 .

[27]  H. Kretzschmar,et al.  The IAPWS Industrial Formulation 1997 for the Thermodynamic Properties of Water and Steam , 2000 .

[28]  C. P. Kurian,et al.  Model based control using C2000 microcontroller , 2014, 2014 International Conference on Advances in Energy Conversion Technologies (ICAECT).

[29]  Petar Sabev Varbanov,et al.  Integration and management of renewables into Total Sites with variable supply and demand , 2011, Comput. Chem. Eng..

[30]  Joo-Hyun Lee,et al.  Development of a High Pressure Turbine Bypass System Pressure Control Model for Power Plant Simulator , 2011 .

[31]  W C Kwon,et al.  Design of a tortuous path trim for a high-pressure turbine bypass valve , 2010 .

[32]  Gustavo Urquiza,et al.  Improvement of the Turbine Main Stop Valves with Flow Simulation in Erosion by Solid Particle , 2004 .

[33]  Monica Malvezzi,et al.  HIL simulation of WSP systems on MI-6 test rig , 2006 .

[34]  Alan S. Perelson,et al.  System Dynamics: A Unified Approach , 1976, IEEE Transactions on Systems, Man, and Cybernetics.

[35]  R. Kehlhofer,et al.  Combined-cycle gas and steam turbine power plants. 2. edition , 1991 .

[36]  A. Stodola Steam and gas turbines , 1927 .

[37]  Mihai Iacob,et al.  Real-time hardware-in-the-loop test platform for thermal power plant control systems , 2011, 2011 IEEE 9th International Symposium on Intelligent Systems and Informatics.