Maintenance and quality: the missing link

Focuses on the relationship between maintenance and quality. Then briefly reviews models relating production and quality on the one hand, and production and maintenance on the other. Using concepts from predictive maintenance and the measure of equipment effectiveness from total productive maintenance (TPM), identifies explicit links between maintenance and quality. Emphasizes the need to develop adequate models relating maintenance and quality. Presents two approaches for modelling the link between maintenance and quality. The first approach is based on the concept of imperfect maintenance and the second one uses the Taguchi approach to quality and maintenance.

[1]  Acheson J. Duncan,et al.  The Economic Design of X Charts Used to Maintain Current Control of a Process , 1956 .

[2]  A. K. S. Jardine,et al.  Maintenance, Replacement, and Reliability , 2021 .

[3]  William P. Pierskalla,et al.  A survey of maintenance models: The control and surveillance of deteriorating systems , 1976 .

[4]  Graham K. Rand,et al.  Decision Systems for Inventory Management and Production Planning , 1979 .

[5]  Arnoldo C. Hax,et al.  Production and inventory management , 1983 .

[6]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[7]  Young Ho Chun,et al.  An Algorithm for Preventive Maintenance Policy , 1986, IEEE Transactions on Reliability.

[8]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[9]  P. K. Banerjee,et al.  THE ECONOMIC DESIGN OF CONTROL CHARTS: A RENEWAL THEORY APPROACH , 1987 .

[10]  M. A. Rahim,et al.  Economic design of x -control charts under Weibull shock models , 1988 .

[11]  T. Nakagawa Sequential imperfect preventive maintenance policies , 1988 .

[12]  John H. Sheesley,et al.  Quality Engineering in Production Systems , 1988 .

[13]  Meir J. Rosenblatt,et al.  A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay , 1989 .

[14]  A. Seidmann,et al.  Production lot sizing with machine breakdowns , 1992 .

[15]  M. A. Rahim JOINT DETERMINATION OF PRODUCTION QUANTITY, INSPECTION SCHEDULE, AND CONTROL CHART DESIGN , 1994 .

[16]  Jezdimir Knezevic,et al.  Achieving quality through supportability ‐ part I: concepts and principles , 1996 .