Critical Requirements Engineering Issues and their Solution

The guidelines for Requirements Management have been documented many times formally but the actual problems faced by the software industry are quite different. Through research it is found that most of the software projects fail before they are completed or if they do reach completion their quality is not up to the mark. The aim of this Research study is to identify the loopholes in the requirements gathering practices and how they are affecting the entire SDLC including and final product. I have also tried to find solutions to these issues on basis of international research. The goal is towards making the requirements gathering practices effective by replacing these issues with respective solutions.