Optimum workforce scheduling under the (14, 21) days-off timetable
暂无分享,去创建一个
[1] L. Douglas Smith,et al. A set‐processing algorithm for scheduling staff on 4‐day or 3‐day work weeks , 1998 .
[2] Hamilton Emmons,et al. MULTIPLE-SHIFT WORKFORCE SCHEDULING UNDER THE 3-4 COMPRESSED WORKWEEK WITH A HIERARCHICAL WORKFORCE , 1993 .
[3] R Hung. Single-shift workforce scheduling under a compressed workweek , 1991 .
[4] James J. Browne,et al. Introduction to Employee Scheduling , 1992 .
[5] Hesham K. Alfares. An efficient two-phase algorithm for cyclic days-off scheduling , 1998, Comput. Oper. Res..
[6] Hamilton Emmons,et al. Off-Day Scheduling with Hierarchical Worker Categories , 1991, Oper. Res..
[7] Alain Billionnet. Integer programming to schedule a hierarchical workforce with variable demands , 1999, Eur. J. Oper. Res..
[8] Rangarajan Narasimhan. An algorithm for single shift scheduling of hierarchical workforce , 1997 .
[9] Hesham K. Alfares,et al. Integrated project task and manpower scheduling , 1997 .