PERFORMANCE OF CONCRETE PLACING IN HONG KONG BUILDINGS
暂无分享,去创建一个
A study was made in the early 1990s of the utilization of labor and equipment resources in the in situ concreting of buildings in Hong Kong. The study involved close observation of 154 pours on building construction sites and 38 days spent at 38 ready-mixed concrete (RMC) batching plants, one day at each. Much detailed productivity information has been derived and the different concrete placing methods have been compared. Other factors affecting the placing rates, pour size, type of pour, and supply of concrete have also been studied. Benchmarks, which describe the state of the industry in broad terms, have been produced not only for measuring progress in the standards applying in Hong Kong as time goes by but also for making comparisons with other large cities.
[1] Paul. Olomolaiye,et al. An evaluation of transportation systems for high rise concrete construction , 1996 .
[2] Dic PhD CEng Mhkie Fice Michael Anson Ba,et al. Hong Kong Performance Yardsticks For Concrete Placing During Building Construction , 1994 .
[3] Mohan M. Kumaraswamy,et al. A study of the factors affecting construction durations in Hong Kong , 1995 .
[4] M. Anson,et al. Concrete pumping in the UK and West Germany: a comparison , 1989 .