Safety risk management for electrical transmission and distribution line construction
暂无分享,去创建一个
[1] A. Strauss,et al. Basics of qualitative research: Grounded theory procedures and techniques. , 1992 .
[2] Daniel W. Halpin,et al. Predictive Tool for Estimating Accident Risk , 2003 .
[3] Maurice Oxenburgh,et al. The productivity assessment tool: computer-based cost benefit analysis model for the economic assessment of occupational health and safety interventions in the workplace. , 2005, Journal of safety research.
[4] David V. maccollum. Construction Safety Engineering Principles , 1995 .
[5] PROGRAM MANAGEMENT Measuring Safety ’ s RETURN ON INVESTMENT , .
[6] Thomas H. Wonnacott,et al. Introductory Statistics , 2007, Technometrics.
[7] J. Norwood,et al. Occupational outlook handbook , 1990 .
[8] Matthew R. Hallowell. Cost‐effectiveness of construction safety programme elements , 2010 .
[9] Stuart D. Anderson,et al. Strategies for Achieving Excellence in Construction Safety Performance , 1996 .
[10] Clive Smallman,et al. British directors perspectives on the impact of health and safety on corporate performance , 2001 .
[11] Matthew R. Hallowell. Risk-Based Framework for Safety Investment in Construction Organizations , 2011 .
[12] F. J. Fowler,et al. Standardized Survey Interviewing: Minimizing Interviewer-Related Error. , 1989 .
[13] Enno Koehn,et al. Safety Management: Problems Encountered and Recommended Solutions , 2000 .
[14] A. Strauss,et al. Basics of qualitative research: Grounded theory procedures and techniques. , 1993 .
[15] Roy Duff,et al. Use of performance measurement and goal setting to improve construction managers' focus on health and safety , 2007 .
[16] G Karady George. Concept of Energy Transmission and Distribution , 2007 .
[17] Mumtaz Usmen,et al. Comparative Injury and Fatality Risk Analysis of Building Trades , 2006 .
[18] John A. Gambatese,et al. Activity-Based Safety Risk Quantification for Concrete Formwork Construction , 2009 .
[19] Linda Heath,et al. Applications of Heuristics and Biases to Social Issues , 2013 .
[20] W. Lowrance,et al. Of Acceptable Risk: Science and the Determination of Safety , 1976 .
[21] Rafael Sacks,et al. Spatial and Temporal Exposure to Safety Hazards in Construction , 2009 .
[22] A. Bryman. Social Research Methods , 2001 .
[23] K. C. Ying,et al. Impact of social safety investments on social costs of construction accidents , 2004 .
[24] Jimmie Hinze,et al. Analysis of fatalities and injuries due to powerline contacts , 1996 .
[25] J Still,et al. Electrocution due to contact of industrial equipment with power lines. , 1997, Burns : journal of the International Society for Burn Injuries.
[26] Frank R. Spellman. Surviving an OSHA Audit: A Managent Guide , 1998 .
[27] P Soyka. Capturing the business value of EH&S excellence , 1998 .
[28] Phil Hughes,et al. Introduction to Health and Safety in Construction , 2006 .
[29] G.T. Homce,et al. An alarm to warn of overhead power line contact by mobile equipment , 2001, Conference Record of the 2001 IEEE Industry Applications Conference. 36th IAS Annual Meeting (Cat. No.01CH37248).
[30] P. Balducci,et al. Electric Power Interruption Cost Estimates for Individual Industries, Sectors, and the U.S. Economy , 2003 .
[31] L. B. Gordon,et al. A complete electrical hazard classification system and its application , 2009, 2009 IEEE IAS Electrical Safety Workshop.
[32] Timothy S. Simpson. DEVELOPMENT OF NFPA 1500, STANDARD ON FIRE DEPARTMENT OCCUPATIONAL SAFETY AND HEALTH PROGRAM, 1997 EDITION, COMPLIANCE PLAN FOR THE CLEARCREEK FIRE DISTRICT , 2002 .
[33] Osama A. Jannadi,et al. RISK ASSESSMENT IN CONSTRUCTION , 2003 .
[34] Mary Capelli-Schellpfeffer,et al. Electrical Safety Handbook , 1994 .
[35] Paul Chinowsky,et al. Safety risk interactions among highway construction work tasks , 2011 .
[36] Ted Miller,et al. Costs of occupational injuries in construction in the United States. , 2007, Accident; analysis and prevention.
[37] John G. Everett,et al. Costs of accidents and injuries to the construction industry , 1996 .
[38] Dongping Fang,et al. Safety Risk Identification and Assessment for Beijing Olympic Venues Construction , 2008 .
[39] M. Patton,et al. Qualitative evaluation and research methods , 1992 .
[40] Rafael Sacks,et al. Construction Job Safety Analysis , 2010 .
[41] R. Lee,et al. Biophysical injury mechanisms in electrical shock trauma. , 2000, Annual review of biomedical engineering.
[42] G. Emre Gürcanli,et al. An occupational safety risk analysis method at construction sites using fuzzy sets , 2009 .
[43] Richard G Trohman,et al. Narrative Review: Electrocution and Life-Threatening Electrical Injuries , 2006, Annals of Internal Medicine.
[44] Matthew R. Hallowell. Safety risk perception in construction companies in the Pacific Northwest of the USA , 2010 .
[45] A. Field. Discovering statistics using SPSS for Windows. , 2000 .
[46] R. Lee,et al. Electrical injury: mechanisms, manifestations, and therapy , 2003 .