Automatic detection of the best performing priority rule for the resource-constrained project scheduling problem
暂无分享,去创建一个
Mario Vanhoucke | Weikang Guo | José Coelho | Jingyu Luo | M. Vanhoucke | J. Coelho | Weikang Guo | Jingyu Luo
[1] Robert Klein,et al. Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects , 2000, Eur. J. Oper. Res..
[2] Mario Vanhoucke,et al. A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem , 2007, Oper. Res..
[3] N. R. Sakthivel,et al. Vibration based fault diagnosis of monoblock centrifugal pump using decision tree , 2010, Expert Syst. Appl..
[4] Erik Demeulemeester,et al. RanGen: A Random Network Generator for Activity-on-the-Node Networks , 2003, J. Sched..
[5] Salah E. Elmaghraby,et al. On the measurement of complexity in activity networks , 1980 .
[6] Sönke Hartmann,et al. Project Scheduling under Limited Resources , 1999 .
[7] Gündüz Ulusoy,et al. Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling , 1989 .
[8] Shinichiro Koga,et al. A prediction rule for the development of delirium among patients in medical wards: Chi-Square Automatic Interaction Detector (CHAID) decision tree analysis model. , 2013, The American journal of geriatric psychiatry : official journal of the American Association for Geriatric Psychiatry.
[9] Edward W. Davis,et al. Project Network Summary Measures Constrained- Resource Scheduling , 1975 .
[10] J. R. Quinlan. Induction of decision trees , 2004, Machine Learning.
[11] Amanda Clare,et al. Knowledge Discovery in Multi-label Phenotype Data , 2001, PKDD.
[12] Ronald L. Graham,et al. Bounds on Multiprocessing Timing Anomalies , 1969, SIAM Journal of Applied Mathematics.
[13] Dale F. Cooper,et al. Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation , 1976 .
[14] Rainer Kolisch,et al. Characterization and generation of a general class of resource-constrained project scheduling problems , 1995 .
[15] Rainer Kolisch,et al. PSPLIB - a project scheduling problem library , 1996 .
[16] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..
[17] Rainer Kolisch,et al. Experimental investigation of heuristics for resource-constrained project scheduling: An update , 2006, Eur. J. Oper. Res..
[18] Ramón Alvarez-Valdés Olaguíbel,et al. Chapter 5 – HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS , 1989 .
[19] Fabrizio Sebastiani,et al. Machine learning in automated text categorization , 2001, CSUR.
[20] Patrick De Causmaecker,et al. An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem , 2014, Eur. J. Oper. Res..
[21] Jean-Luc Meunier,et al. Comparing Machine Learning Approaches for Table Recognition in Historical Register Books , 2018, 2018 13th IAPR International Workshop on Document Analysis Systems (DAS).
[22] Mario Vanhoucke,et al. An evaluation of the adequacy of project network generators with systematically sampled networks , 2008, Eur. J. Oper. Res..
[23] James H. Patterson,et al. Project scheduling: The effects of problem structure on heuristic performance , 1976 .
[24] Mario Vanhoucke,et al. A tool to test and validate algorithms for the resource-constrained project scheduling problem , 2018, Comput. Ind. Eng..
[25] Eyke Hüllermeier,et al. Multilabel classification via calibrated label ranking , 2008, Machine Learning.
[26] Sönke Hartmann,et al. A survey of variants and extensions of the resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..
[27] Witold Pedrycz,et al. Genetically optimized fuzzy decision trees , 2005, IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics).
[28] Geoff Holmes,et al. Classifier chains for multi-label classification , 2009, Machine Learning.
[29] Mario Vanhoucke,et al. An exact composite lower bound strategy for the resource-constrained project scheduling problem , 2018, Comput. Oper. Res..
[30] Erik Demeulemeester,et al. A classification scheme for project scheduling problems , 1998 .
[31] Ozgur Baskan. Optimization Algorithms - Methods and Applications , 2016 .
[32] Roman Slowinski,et al. Fuzzy priority heuristics for project scheduling , 1996, Fuzzy Sets Syst..
[33] Y. Zhao,et al. Comparison of decision tree methods for finding active objects , 2007, 0708.4274.
[34] Min-Ling Zhang,et al. A Review on Multi-Label Learning Algorithms , 2014, IEEE Transactions on Knowledge and Data Engineering.
[35] Willy Herroelen,et al. On the use of the complexity index as a measure of complexity in activity networks , 1996 .
[36] Robert Pellerin,et al. A survey of hybrid metaheuristics for the resource-constrained project scheduling problem , 2020, Eur. J. Oper. Res..
[37] Kum Khiong Yang. A comparison of dispatching rules for executing a resource-constrained project with estimated activity durations , 1998 .
[38] Rainer Kolisch,et al. PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .
[39] José Coelho,et al. Comparative analysis on approximation algorithms for the resource constrained project scheduling problem , 2002 .
[40] R. Kolisch,et al. Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis , 1999 .
[41] Robert Klein,et al. Project scheduling with time-varying resource constraints , 2000 .
[42] A. A. Mastor,et al. An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques , 1970 .
[43] Jin Chen,et al. Decision tree and PCA-based fault diagnosis of rotating machinery , 2007 .
[44] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .
[45] Said Salhi,et al. An investigation into the relationship of heuristic performance with network-resource characteristics , 1997 .
[46] Bert De Reyck,et al. DEPARTEMENT TOEGEPASTE ECONOMISCHE WETENSCHAPPEN PHASE TRANSITIONS IN PROJECT SCHEDULING , 2022 .
[47] Roman Słowiński,et al. Advances in project scheduling , 1989 .
[48] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[49] Grigorios Tsoumakas,et al. Mining Multi-label Data , 2010, Data Mining and Knowledge Discovery Handbook.
[50] J. Ross Quinlan,et al. Improved Use of Continuous Attributes in C4.5 , 1996, J. Artif. Intell. Res..
[51] Zhi-Hua Zhou,et al. ML-KNN: A lazy learning approach to multi-label learning , 2007, Pattern Recognit..
[52] Ian H. Witten,et al. Data mining: practical machine learning tools and techniques, 3rd Edition , 1999 .
[53] Erik Demeulemeester,et al. Project scheduling : a research handbook , 2002 .
[54] Jiebo Luo,et al. Learning multi-label scene classification , 2004, Pattern Recognit..
[55] Mario Vanhoucke,et al. An Overview of Project Data for Integrated Project Management and Control , 2016 .
[56] Wei-Yin Loh,et al. A Comparison of Prediction Accuracy, Complexity, and Training Time of Thirty-Three Old and New Classification Algorithms , 2000, Machine Learning.
[57] Jason Weston,et al. A kernel method for multi-labelled classification , 2001, NIPS.
[58] Grigorios Tsoumakas,et al. Random k -Labelsets: An Ensemble Method for Multilabel Classification , 2007, ECML.
[59] Eisaku Maeda,et al. Maximal Margin Labeling for Multi-Topic Text Categorization , 2004, NIPS.