A coordinated two-phase approach for operational decisions with vehicle routing in a single-vendor multi-buyer system
暂无分享,去创建一个
[1] Zhi-Long Chen,et al. Integrated Production and Outbound Distribution Scheduling: Review and Extensions , 2010, Oper. Res..
[2] Heinrich Kuhn,et al. Simultaneous supply and production planning , 2011 .
[3] M. A. Hoque,et al. An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors , 2011, Eur. J. Oper. Res..
[4] R. M. Hill,et al. Another look at the single-vendor single-buyer integrated production-inventory problem , 2006 .
[5] James J. Solberg,et al. Operations Research: Principles and Practice. , 1977 .
[6] R. J. Tersine. Principles of inventory and materials management , 1982 .
[7] Suresh Kumar Goyal,et al. An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment , 2000 .
[8] Yu-Jen Lin,et al. An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost , 2009, Comput. Ind. Eng..
[9] Liang-Yuh Ouyang,et al. Mixture inventory model involving variable lead time with a service level constraint , 1997, Comput. Oper. Res..
[10] Lun-Hao Lin,et al. A note on a study of an integrated inventory with controllable lead time , 2011 .
[11] Sarada Prasad Sarmah,et al. Coordination of a single-manufacturer/multi-buyer supply chain with credit option , 2008 .
[12] Wen-Chuan Lee,et al. Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate , 2006, Appl. Math. Comput..
[13] Herbert E. Scarf,et al. Optimal Policies for a Multi-Echelon Inventory Problem , 1960, Manag. Sci..
[14] Suresh Kumar Goyal,et al. A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer , 2006 .
[15] Jason Chao-Hsien Pan,et al. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .
[16] Rakesh Nagi,et al. A review of integrated analysis of production-distribution systems , 1999 .
[17] Yu-Cheng Hsiao,et al. Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information , 2008 .
[18] Ilkyeong Moon,et al. The distribution free continuous review inventory system with a service level constraint , 1994 .
[19] Marshall L. Fisher,et al. Coordination of production and distribution planning , 1994 .
[20] Douglas J. Thomas,et al. Coordinated supply chain management , 1996 .
[21] Christian Prins,et al. A memetic algorithm with dynamic population management for an integrated production-distribution problem , 2009, Eur. J. Oper. Res..
[22] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[23] M. Darwish,et al. Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost , 2007, Eur. J. Oper. Res..
[24] A. Ruszczynski,et al. On the integrated production, inventory, and distribution routing problem , 2006 .
[25] L. Ouyang,et al. Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .
[26] Francesca Fumero,et al. Synchronized Development of Production, Inventory, and Distribution Schedules , 1999, Transp. Sci..
[27] G. Clarke,et al. Scheduling of Vehicles from a Central Depot to a Number of Delivery Points , 1964 .
[28] C. Liao,et al. An Analytical Determination of Lead Time with Normal Demand , 1991 .
[29] Kripa Shanker,et al. Two-echelon supply chain inventory model with controllable lead time and service level constraint , 2009, Comput. Ind. Eng..
[30] R. Ibrahim,et al. Joint economic lot size in distribution system with multiple shipment policy , 2006 .
[31] Jonathan F. Bard,et al. Heuristics for a multiperiod inventory routing problem with production decisions , 2009, Comput. Ind. Eng..
[32] Christian Prins,et al. A reactive GRASP and path relinking for a combined production-distribution problem , 2007, Comput. Oper. Res..
[33] Jonathan F. Bard,et al. The integrated production–inventory–distribution–routing problem , 2009, J. Sched..
[34] Y. B. Park,et al. An integrated approach for production and distribution planning in supply chain management , 2005 .
[35] M. A. Hoque,et al. Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain , 2008, Eur. J. Oper. Res..
[36] C. Glock. The joint economic lot size problem: A review , 2012 .
[37] Chang-Hyun Kim. Production and Shipment Lot Sizing in a Vendor-Buyer Supply Chain with Freight Cost Discounts , 2009 .
[38] Chei-Chang Chiou,et al. An exact policy for enhancing buyer–supplier linkage in supply chain system , 2008 .
[39] David K. Smith,et al. Operations Research: Principles and Practice , 1977 .
[40] Jason Chao-Hsien Pan,et al. A study of an integrated inventory with controllable lead time , 2002 .
[41] L. Ouyang,et al. An integrated vendor–buyer inventory model with quality improvement and lead time reduction , 2007 .
[42] Liang-Yuh Ouyang,et al. A periodic review inventory model involving variable lead time with a service level constraint , 2000, Int. J. Syst. Sci..
[43] Christian Prins,et al. Fast heuristics for a combined production planning and vehicle routing problem , 2008 .
[44] Kripa Shanker,et al. A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items , 2009 .
[45] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[46] M. Darwish,et al. The joint economic lot sizing problem: Review and extensions , 2008, Eur. J. Oper. Res..