A fuzzy simulation model for evaluating the concession items of public-private partnerships schemes

The investment return, tariff regime and concession period are the most important items that influence the success of a concession-based Public-Private Partnership (PPP) project. From the public partner’s perspective, whether a scheme is value-for-money or not dominates the decision making process. However, a seemingly favorable deal may turn out to be the least value-for-money option should it cause unnecessary social upheaval, such as excessive tariff increases or complaints. A scheme which is truly value-for-money is one which balances the interests of the public partner, investor and end-users. In this paper, a simulation model is proposed to assist a public partner to identify the concession period based on the expected investment and tariff regime. The needs for establishing different scenarios to represent the risks and uncertainties involved are presented, and a fuzzy multi-objective decision model is introduced to trade-off the associated three concession items. The combined features of the simulation and fuzzy multi-objective decision models enable the scenario most likely to result in a “win-win-win” concession scheme to be identified. A hypothetical example is used to illustrate the proposed model. This highlights the importance of the decision-makers’ perception of the concession items in influencing their selection, and the influence of the group decision-making involved.

[1]  Franco Caron,et al.  Risk Analysis to Assess Completion Time of a Tram-Line , 2001 .

[2]  Wen-June Wang,et al.  New algorithms for solving fuzzy relation equations , 2002, Math. Comput. Simul..

[3]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[4]  Mohan M. Kumaraswamy,et al.  HONG KONG EXPERIENCE IN MANAGING BOT PROJECTS , 2001 .

[5]  Stephen O Ogunlana,et al.  Profitable Partnering in Construction Procurement , 1999 .

[6]  Lucy W. Chege PRIVATE FINANCING OF CONSTRUCTION PROJECTS AND PROCUREMENT SYSTEMS: AN INTEGRATED APPROACH , 2001 .

[7]  Dengfeng Li,et al.  Fuzzy multiattribute decision-making models and methods with incomplete preference information , 1999, Fuzzy Sets Syst..

[8]  Y. K. Wen,et al.  Minimum Building Life-Cycle Cost Design Criteria. I: Methodology , 2001 .

[9]  Robert L. K. Tiong,et al.  The effect of concession period design on completion risk management of BOT projects , 2003 .

[10]  Hans-Jürgen Zimmermann,et al.  Fuzzy Set Theory - and Its Applications , 1985 .

[11]  Lotfi A. Zadeh,et al.  Similarity relations and fuzzy orderings , 1971, Inf. Sci..

[12]  Joseph H. M. Tah,et al.  A fuzzy approach to constuction project risk assessment and analysis: construction project risk management system , 2001 .

[13]  Li yin Shen,et al.  Risk Concession Model for Build/Operate/Transfer Contract Projects , 2005 .

[14]  H. Bierman,et al.  The Capital Budgeting Decision: Economic Analysis of Investment Projects , 1981 .

[15]  Elie Sanchez,et al.  Resolution of Composite Fuzzy Relation Equations , 1976, Inf. Control..

[16]  Roger H. Evje,et al.  The practical application of delivery methods to project portfolios , 1999 .

[17]  R. Słowiński Fuzzy sets in decision analysis, operations research and statistics , 1999 .

[18]  G. Earl From the three P's to the three W's PUBLIC PRIVATE PARTNERSHIPS AND BEYOND , 2003 .

[19]  Florentin Smarandache,et al.  FUZZY RELATIONAL MAPS AND NEUTROSOPHIC RELATIONAL MAPS , 2020 .

[20]  Esther Malini,et al.  BUILD OPERATE TRANSFER MUNICIPAL BRIDGE PROJECTS IN INDIA , 1999 .

[21]  Heng Li,et al.  Alternative Concession Model for Build Operate Transfer Contract Projects , 2002 .

[22]  M. Z. Ragab,et al.  On the min-max composition of fuzzy matrices , 1995, Fuzzy Sets Syst..

[23]  Robert L. K. Tiong,et al.  Automated Approach to Negotiation of BOT Contracts , 1997 .

[24]  Roberto Pietroforte,et al.  Procurement methods for US infrastructure: historical perspectives and recent trends , 2002 .

[25]  A. Akintoye,et al.  Public Private Partnerships: Managing Risks and Opportunities , 2003 .

[26]  Simaan M. AbouRizk,et al.  Determining a reasonable concession period for private sector provision of public works and service , 2006 .

[27]  Tarek Zayed,et al.  Prototype Model for Build-Operate-Transfer Risk Assessment , 2002 .