Short-term planning for open pit mines: a review
暂无分享,去创建一个
Peter J. Stuckey | Adrian R. Pearce | Michelle Blom | Michelle L. Blom | Peter James Stuckey | A. Pearce
[1] Alexandra M. Newman,et al. A Review of Operations Research in Mine Planning , 2010, Interfaces.
[2] Erhan Kozan,et al. An Open-Pit Multi-Stage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations , 2018 .
[3] Raul Vivas. AN INTEGRATED MINE PLAN - CONNECTING LONG, MEDIUM AND SHORT TERM PLANNING STRATEGIES AT GOLDCORP PENASQUITO , 2013 .
[4] Jim Everett,et al. Computer aids for production systems management in iron ore mining , 2007 .
[5] John R. Sturgul,et al. Simulation models for surface mines , 1987 .
[6] C. Musingwini,et al. Presidential address: Optimization in underground mine planning-developments and opportunities. , 2016 .
[7] Louis Caccetta,et al. Application of Optimisation Techniques in Open Pit Mining , 2007 .
[8] Roussos G. Dimitrakopoulos,et al. Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions , 2014, Eur. J. Oper. Res..
[9] Randall P. Sadowski,et al. Simulation with Arena , 1998 .
[10] Martin L. Smith,et al. Mine production scheduling for optimization of plant recovery in surface phosphate operations , 1995 .
[11] Roussos Dimitrakopoulos,et al. Adaptive policies for short-term material flow optimization in a mining complex , 2017, Mining Technology.
[12] Alexandra M. Newman,et al. MineLib: a library of open pit mining problems , 2013, Ann. Oper. Res..
[13] J. Benndorf,et al. The effect of geological uncertainty on achieving short-term targets: A quantitative approach using Stochastic process simulation , 2015 .
[14] H. Askari-Nasab,et al. Simulation and optimization approach for uncertainty-based short-term planning in open pit mines , 2017 .
[15] Morteza Osanloo,et al. Optimizing short-term production plan using a portfolio optimization model , 2017 .
[16] Ali Moradi Afrapoli,et al. Mining fleet management systems: a review of models and algorithms , 2019 .
[17] Peter Knights,et al. Integration of real options into short-term mine planning and production scheduling , 2009 .
[18] Marcelo Moretti Fioroni,et al. Concurrent simulation and optimization models for mining planning , 2008, 2008 Winter Simulation Conference.
[19] H. L. Ong,et al. A fast tabu search algorithm for the group shop scheduling problem , 2005, Adv. Eng. Softw..
[20] J. Benndorf,et al. Performance optimization of complex continuous mining system using stochastic simulation , 2014 .
[21] Alan T. Murray,et al. HANDBOOK OF OPERATIONS RESEARCH IN NATURAL RESOURCES , 2007 .
[22] H. Askari-Nasab,et al. Hierarchical mine production scheduling using discrete-event simulation , 2010 .
[23] Martin L. Smith. Optimizing short-term production schedules in surface mining: Integrating mine modeling software with AMPL/CPLEX , 1998 .
[24] Erhan Kozan,et al. A short-term production scheduling methodology for open-pit mines , 2013 .
[25] Erhan Kozan,et al. A new open-pit multi-stage mine production timetabling model for drilling, blasting and excavating operations , 2016 .
[26] M. Govinda Raj,et al. Production optimisation using simulation models in mines: a critical review , 2009 .
[27] Behrooz Karimi,et al. Long-term open pit mine production planning: a review of models and algorithms , 2008 .
[28] C. Fricke,et al. Modeling the mining supply chain from mine to port: A combined optimization and simulation approach , 2011 .
[29] Zhongxue Li,et al. New developments in simulation technology and applications in the minerals industry , 1997 .
[30] Diatha Krishna Sundar,et al. Blast schedule planning and shiftwise production scheduling of an opencast iron ore mine , 1995 .
[31] Alexandra M. Newman,et al. Open-Pit Block-Sequencing Formulations: A Tutorial , 2014, Interfaces.
[32] George N. Panagiotou. Discrete mine system simulation in Europe , 1999 .
[33] J. Benndorf. Moving towards Real-Time Management of Mineral Reserves – A Geostatistical and Mine Optimization Closed-Loop Framework , 2014 .
[34] Peter Knights,et al. Applications of discrete mine simulation modeling in South America , 1999 .
[35] Peter J. Stuckey,et al. Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: A Mine Planning Case Study , 2015, CPAIOR.
[36] R. J. Turner. Simulation in the mining industry of South Africa , 1999 .
[37] Jim Everett,et al. Maintaining product grade from diverse mine sites at BHP Billiton Iron Ore Newman Joint Venture , 2008 .
[38] Peter J. Stuckey,et al. A Decomposition-Based Algorithm for the Scheduling of Open-Pit Networks Over Multiple Time Periods , 2016, Manag. Sci..
[39] Peter J. Stuckey,et al. A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines , 2014, INFORMS J. Comput..
[40] John Hadjigeorgiou,et al. Production scheduling optimization in open pit mines , 1993 .
[41] Alexandra M. Newman,et al. A solution approach for optimizing long- and short-term production scheduling at LKAB's Kiruna mine , 2011, Eur. J. Oper. Res..
[42] H. Askari-Nasab,et al. Dynamic shovel allocation approach to short-term production planning in open-pit mines , 2019 .
[43] Peter J. Stuckey,et al. Short-term scheduling of an open-pit mine with multiple objectives , 2017 .
[44] Mark Gershon. Heuristic approaches for mine planning and production scheduling , 1987 .
[45] Michel Gamache,et al. Mixed integer programming model for short term planning in open-pit mines , 2013 .
[46] Erkan Topal,et al. Integrated short and medium term underground mine production scheduling , 2012 .
[47] H. Askari-Nasab,et al. A linkage of truck-and-shovel operations to short-term mine plans using discrete-event simulation , 2015 .
[48] Peter J. Stuckey,et al. Planning for Mining Operations with Time and Resource Constraints , 2014, ICAPS.
[49] Jim E. Everett,et al. Iron ore production scheduling to improve product quality , 2001, Eur. J. Oper. Res..
[50] Nick Vagenas. Applications of discrete-event simulation in Canadian mining operations in the nineties , 1999 .
[51] Tom Sandeman,et al. Integrating optimization and simulation - A comparison of two case studies in mine planning , 2010, Proceedings of the 2010 Winter Simulation Conference.
[52] Erhan Kozan,et al. Open-pit block sequencing optimization: A mathematical model and solution technique , 2016 .
[53] M. J. F. Souza,et al. A hybrid heuristic algorithm for the open-pit-mining operational planning problem , 2010, Eur. J. Oper. Res..
[54] M. Kamperman,et al. Controlling product quality at high production rates as applied to BHP Billiton Iron Ore Yandi fines operation , 2002 .
[55] Morteza Osanloo,et al. Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty , 2016 .
[56] Roussos Dimitrakopoulos,et al. Stochastic optimization for strategic mine planning: A decade of developments , 2011 .
[57] R Dimitrakopoulos,et al. Joint stochastic optimisation of short and long term mine production planning: method and application in a large operating gold mine , 2013 .
[58] Gaurav Singh,et al. A resource constrained scheduling problem with multiple independent producers and a single linking constraint: A coal supply chain example , 2014, Eur. J. Oper. Res..
[59] Michel Gamache,et al. Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit Mines , 2001 .
[60] H Eivazy,et al. A mixed integer linear programming model for short-term open pit mine production scheduling , 2012 .
[61] H. L. Ong,et al. Metaheuristics for the Mixed shop Scheduling Problem , 2004, Asia Pac. J. Oper. Res..
[62] Gaurav Singh,et al. Distributed optimisation method for multi-resource constrained scheduling in coal supply chains , 2013 .
[63] Erhan Kozan,et al. Comparative analysis of three metaheuristics for short-term open pit block sequencing , 2016, J. Heuristics.
[64] J. Benndorf,et al. Operational Decision Support for Material Management in Continuous Mining Systems: From Simulation Concept to Practical Full-Scale Implementations , 2017 .
[65] Javad Gholamnejad. A zero-one integer programming model for open pit mining sequences , 2008 .
[66] Arun J. Basu,et al. Discrete event simulation of mining systems: Current practice in Australia , 1999 .
[67] John R. Sturgul. Discrete mine system simulation in the United States , 1999 .
[68] A. Alan B. Pritsker,et al. Introduction to simulation and SLAM II , 1979 .
[69] Marcus Brazil,et al. Optimisation in underground mining , 2007 .
[70] Frederico G. Guimarães,et al. Multi-objective approaches for the open-pit mining operational planning problem , 2012, Electron. Notes Discret. Math..
[71] Kadri Dagdelen,et al. Optimal blending of mine production using goal programming and interactive graphics systems , 1995 .
[72] Erhan Kozan,et al. Integration of mathematical models for ore mining industry , 2019 .
[73] A. Jewbali,et al. Stochastic Mine Planning—Example and Value from Integrating Long- and Short-Term Mine Planning Through Simulated Grade Control, Sunrise Dam, Western Australia , 2018 .
[74] John Sturgul. Modeling and Simulation in Mining - Its Time Has Finally Arrived , 2001, Simul..
[75] Erhan Kozan,et al. A hybrid shifting bottleneck procedure algorithm for the parallel-machine job-shop scheduling problem , 2012, J. Oper. Res. Soc..