Time and cost overruns in power projects in Kenya: A case study of Kenya electricity generating Company limited

Time and cost overruns in infrastructure development projects during implementation continue to pose great challenges to developing countries. Research has found that many factors impede the successful completion of projects on time, within budget and of good quality. This study sought to investigate the factors that significantly contributed to time and cost overruns in power projects implemented by KenGen, to evaluate their relative ranking and to quantify their impacts. The study was based on a questionnaire survey conducted with persons drawn from contractors, consultants and KenGen, who are involved in the implementation of one or more of the four projects in the study. Analysis of 33 significant variables from the survey revealed eight underlying factors contributing to overruns, namely, contractors’ inability, improper project preparation, resource planning, interpretation of requirements, definition of the work involved, timeliness, government bureaucracy and risk allocation. As regards ranking, government bureaucracy topped the list while risk allocation was shown to have been the least significant. There was also a perception that these factors would recur in KenGen’s future projects in a similar implementation environment. By closely relating the factors to the variables, it was observed that they resulted in overruns in the projects by varying magnitudes. The projects had time overruns ranging from –4.6% to 53.4 %, while the  cost overruns varied between 9.4% and 29%. These revelations should enable planners to take stock of past performance and incorporate the lessons learnt in future project planning and implementation. Because the variables and underlying factors are likely to recur in future projects, their occurrence needs to be anticipated and appropriate strategies and mechanisms designed in order to overcome or minimize their potential impact. Recommendations are given to assist the Government of Kenya (GoK) and KenGen on how project management could be improved when future projects are planned and implemented. The findings of this paper can be used as a reference by project owners, managers and agencies in developing their own project management strategies. Keywords : KenGen; project management; overruns; variables; factors; project implementation

[1]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[2]  Tzvi Raz,et al.  An empirical analysis of the relationship between project planning and project success , 2003 .

[3]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[4]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[5]  Sebastian Morris,et al.  Cost and Time Overruns in Public Sector Projects , 2005 .

[6]  S. Ogunlana,et al.  Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .

[7]  G. O. Jagboro,et al.  The effects of construction delays on project delivery in Nigerian construction industry , 2002 .

[8]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[9]  Vernon Ireland,et al.  The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects , 1985 .

[10]  D. Kleinbaum,et al.  Applied Regression Analysis and Other Multivariate Methods , 1978 .

[11]  Søren L. Buhl,et al.  How common and how large are cost overruns in transport infrastructure projects? , 2003 .

[12]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[13]  Mohan Raj Manavazhi,et al.  Material and equipment procurement delays in highway projects in Nepal , 2002 .

[14]  Garashie Musa Determination of factors influencing project delays in Water projects in Kenya: The case of government funded projects , 1999 .

[15]  T. Mezher,et al.  Causes of delays in the construction industry in Lebanon , 1998 .

[16]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[17]  R Youker,et al.  Managing the international project environment , 1992 .

[18]  K. P. Kannan,et al.  Time and cost over-runs of the power projects in Kerala , 2001 .

[19]  Stephen O. Ogunlana,et al.  Large construction projects in developing countries: a case study from Vietnam , 2004 .

[20]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[21]  R. B Karimi Factors which are critical in project cost overruns, A case study of ministry of water resources projects , 1998 .

[22]  Alfred Atsango B. A Talukhaba Time and cost performance of Construction Project , 1988 .