The lot size and inspection schedule in the integrated vendor-buyer supply chain system
暂无分享,去创建一个
[1] Graham K. Rand,et al. Decision Systems for Inventory Management and Production Planning , 1979 .
[2] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[3] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[4] Herbert E. Scarf,et al. Optimal Policies for a Multi-Echelon Inventory Problem , 1960, Manag. Sci..
[5] Soo Y. Chang,et al. Optimal production run length and inspection schedules in a deteriorating production process , 2001 .
[6] Arnoldo C. Hax,et al. Production and inventory management , 1983 .
[7] Meir J. Rosenblatt,et al. Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .
[8] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[9] Meir J. Rosenblatt,et al. A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay , 1989 .
[10] Chang Hyun Kim,et al. An extended EMQ model for a failure prone machine with general lifetime distribution , 1997 .
[11] S. Goyal. “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .