An evaluation of forecasting methods for aircraft non-routine maintenance material demand

Aircraft maintenance can be divided into routine and non-routine activities. Material demand associated with non-routine maintenance is typically intermittent or lumpy: it has a large variance in frequency and quantity. Consequently, this type of demand is hard to predict. This paper introduces a method to collect time series datasets for aircraft non-routine maintenance material demand. Non-routine material consumption is linked to scheduled maintenance tasks to gain insight in demand patterns. A structural part selection of the Boeing 737NG fleet of an aviation partner has been sampled to generate various test cases. Subsequently, various forecasting methods are applied to these test cases and evaluated using various accuracy metrics. For the small time series datasets associated with non-routine maintenance, exponentially weighted moving average (EMA) outperformed smoothing methods such as Croston's method (CR) and the Syntetos-Boylan approximation (SBA). To validate the practical applicability of EMA for non-routine maintenance material demand, the method has been applied and verified in the prediction of actual demand for a separate maintenance C-check.

[1]  Aris A. Syntetos,et al.  Classification for forecasting and stock control: a case study , 2008, J. Oper. Res. Soc..

[2]  Adel A. Ghobbar,et al.  Evaluation of forecasting methods for intermittent parts demand in the field of aviation: a predictive model , 2003, Comput. Oper. Res..

[3]  Ali Haghani,et al.  An optimization model for aircraft maintenance scheduling and re-assignment , 2003 .

[4]  Michael Gilliland IS FORECASTING A WASTE OF TIME , 2002 .

[5]  Andrea Bacchetti,et al.  Empirically-driven hierarchical classification of stock keeping units , 2013 .

[6]  Rob J. Hyndman,et al.  Another Look at Forecast Accuracy Metrics for Intermittent Demand , 2006 .

[7]  L. Duncan,et al.  Forecasting intermittent demand: a comparative study , 2009, J. Oper. Res. Soc..

[8]  Mauro Gamberi,et al.  Managing Lumpy Demand for Aircraft Spare Parts , 2005 .

[9]  A. Solis,et al.  Lumpy demand forecasting using neural networks , 2001, PICMET '01. Portland International Conference on Management of Engineering and Technology. Proceedings Vol.1: Book of Summaries (IEEE Cat. No.01CH37199).

[10]  Roberto Verganti,et al.  A simulation framework for forecasting uncertain lumpy demand , 1999 .

[11]  Nikolaos Kourentzes,et al.  Intermittent demand forecasts with neural networks , 2013 .

[12]  Aris A. Syntetos A Note on Managing Lumpy Demand for Aircraft Spare Parts , 2007 .

[13]  Aris A. Syntetos,et al.  On the categorization of demand patterns , 2005, J. Oper. Res. Soc..

[14]  M. G. Bulmer,et al.  Principles of Statistics. , 1969 .

[15]  Mary E. Johnson,et al.  Planning of Non-Routine Work for Aircraft Scheduled Maintenance , 2009 .

[16]  A. A. Ghobbar Forecasting Intermittent Demand for Aircraft Spare Parts: A Comparative Evaluation of Methods. , 2004 .

[17]  Ruud H. Teunter,et al.  On the bias of Croston's forecasting method , 2009 .

[18]  J. Boylan,et al.  The accuracy of intermittent demand estimates , 2005 .