Online Rescheduling in Semiconductor Manufacturing
暂无分享,去创建一个
[1] Salvatore Cavalieri,et al. A genetic algorithm for job-shop scheduling in a semiconductor manufacturing system , 1999, IECON'99. Conference Proceedings. 25th Annual Conference of the IEEE Industrial Electronics Society (Cat. No.99CH37029).
[2] Paolo Brandimarte,et al. Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure , 2000 .
[3] C. S. Sung,et al. Minimizing makespan on a single burn-in oven in semiconductor manufacturing , 2000, Eur. J. Oper. Res..
[4] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[5] Appa Iyer Sivakumar,et al. Simulation-based scheduling for dynamic discrete manufacturing , 2003, Proceedings of the 2003 Winter Simulation Conference, 2003..
[6] M. D. Johnston. Reconciling high-speed scheduling with dispatching in wafer fabs , 2001, 2001 IEEE International Symposium on Semiconductor Manufacturing. ISSM 2001. Conference Proceedings (Cat. No.01CH37203).
[7] E. Szelke,et al. A learning reactive scheduler using CBR/L , 1997 .
[8] E. Nowicki,et al. A Fast Taboo Search Algorithm for the Job Shop Problem , 1996 .
[9] Chun-Hung Chen,et al. Efficient composition of good enough dispatching policies for semiconductor manufacturing , 2003 .
[10] Minheekim,et al. Simulation-based real-time scheduling in a flexible manufacturing system , 1994 .
[11] Rei Hino,et al. Decentralized Job Shop Scheduling by Recursive Propagation Method , 2002 .
[12] Velusamy Subramaniam,et al. mAOR: A heuristic-based reactive repair mechanism for job shop schedules , 2003 .
[13] Reha Uzsoy,et al. Decomposition algorithms for scheduling semiconductor testing facilities , 1995, Seventeenth IEEE/CPMT International Electronics Manufacturing Technology Symposium. 'Manufacturing Technologies - Present and Future'.
[14] J. A. Svestka,et al. Rescheduling job shops under random disruptions , 1997 .
[15] Yeong-Dae Kim,et al. Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility , 1998 .
[16] R. Hino,et al. Message exchange method for decentralized scheduling , 2001, Proceedings of the 2001 IEEE International Symposium on Assembly and Task Planning (ISATP2001). Assembly and Disassembly in the Twenty-first Century. (Cat. No.01TH8560).
[17] Manfred Mittler,et al. Comparison of dispatching rules for semiconductor manufacturing using large facility models , 1999, WSC '99.
[18] Pei-Chann Chang,et al. One-machine rescheduling heuristics with efficiency and stability as criteria , 1993, Comput. Oper. Res..
[19] H. Toba. Segment-based approach for real-time reactive rescheduling for automatic manufacturing control , 2000 .
[20] John W. Fowler,et al. A new scheduling approach using combined dispatching criteria in wafer fabs , 2003 .
[21] Doo Yong Lee,et al. Scheduling cluster tools in wafer fabrication using candidate list and simulated annealing , 1998, J. Intell. Manuf..
[22] Hark Hwang,et al. Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility , 2003 .
[23] Appa Iyer Sivakumar,et al. Job shop scheduling techniques in semiconductor manufacturing , 2006 .