PPPs and Project Overruns: Evidence from Road Projects in India

Construction cost overrun and time overrun are significant problems in infrastructure projects. This study provides a comparative analysis of the incidence of project overruns in Public Private Partnership (PPP) and non-PPP road projects. Data from national road projects in India was used as the study sample. Means analysis, both using an unmatched sample and matched pair analysis indicated significant overruns between PPP and non-PPP projects. While cost overruns were higher in PPP projects, time overruns were higher in non-PPP projects. These trends persisted in OLS regression estimates. A three stage least squares regression estimated to address the simultaneity bias also showed that use of PPP increased cost overrun, though it did not affect time overrun. Results obtained in this study are contrary to the findings of the previous studies, which have been based on PPP projects in developed economies. The findings emphasize the need for developing countries like India to strengthen their capabilities in PPP models to take advantage of private sector efficiencies.

[1]  G. D. Holt,et al.  Project delays and cost: stakeholder perceptions of traditional v. PPP procurement , 2012 .

[2]  Allan D. Chasey,et al.  Comparison of Public–Private Partnerships and Traditional Procurement Methods in North American Highway Construction , 2012 .

[3]  M. Iacobacci Dispelling the Myths: A Pan-Canadian Assessment of Public-Private Partnerships for Infrastructure Investments , 2010 .

[4]  Ram Singh,et al.  Delays and Cost Overruns in Infrastructure Projects: Extent, Causes and Remedies , 2010 .

[5]  Hugh Goldsmith,et al.  A Comparison of Construction Contract Prices for Traditionally Procured Roads and Public–Private Partnerships , 2009 .

[6]  G. King,et al.  Cem: Coarsened Exact Matching in Stata , 2009 .

[7]  M. Lewis,et al.  Public Private Partnerships and Public Procurement , 2007 .

[8]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[9]  Aminah Robinson Fayek,et al.  Fuzzy Numbers in Cost Range Estimating , 2007 .

[10]  R. Brain PPP construction risk: International evidence from the roads sector , 2007 .

[11]  GERARD DE JONG,et al.  National and International Freight Transport Models: An Overview and Ideas for Future Development , 2004 .

[12]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[13]  James Odeck,et al.  Cost overruns in road construction--what are their sizes and determinants? , 2004 .

[14]  Tarek Hegazy,et al.  Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression , 2003 .

[15]  B. Flyvbjerg,et al.  Megaprojects and Risk. An Anatomy of Ambition , 2003, 1303.7404.

[16]  Søren L. Buhl,et al.  How common and how large are cost overruns in transport infrastructure projects? , 2003 .

[17]  K. P. Kannan,et al.  Time and cost over-runs of the power projects in Kerala , 2001 .

[18]  Stephen O. Ogunlana,et al.  Planning for project control through risk analysis: a petroleum pipeline-laying project , 1994 .

[19]  Jimmie Hinze,et al.  COST OVERRUNS ON STATE OF WASHINGTON CONSTRUCTION CONTRACTS , 1992 .

[20]  David Arditi,et al.  Cost overruns in public projects , 1985 .