A mathematical model for integrating lot-sizing and scheduling problem in capacitated flow shop environments

In this paper, a multiproduct multiperiod capacitated production system that has been organized as a flow shop is considered. The main novelty of the paper is proposing a more efficient mathematical model for the problem of integrating lot sizing and scheduling with sequence-dependent setups. In comparison to the former model, because of fewer continuous and binary decision variables and constraints in the proposed model, this model is very easier to solve. Comparison between two models proves the superiority of the proposed model. Two mixed integer programming-based approaches with rolling horizon framework have been used to solve this model. To evaluate the performance of the proposed model and solution method, problems of different scales have been studied. The used algorithms search the solution space for both lot-sizing and scheduling problems and find a combination of production planning and scheduling that is feasible and close to optimum.

[1]  Horst Tempelmeier,et al.  Dynamic capacitated lot-sizing problems: a classification and review of solution approaches , 2010, OR Spectr..

[2]  Hong-Sen Yan,et al.  Integrated Production Planning and Scheduling on Automobile Assembly Lines , 2003 .

[3]  Hartmut Stadtler,et al.  Supply Chain Management and Advanced Planning , 2000 .

[4]  Mohammad Mohammadi,et al.  Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups , 2010, J. Intell. Manuf..

[5]  Alf Kimms,et al.  Some insights into proportional lot sizing and scheduling , 1998, J. Oper. Res. Soc..

[6]  Diwakar Gupta,et al.  The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times , 2005, Comput. Oper. Res..

[7]  Alf Kimms,et al.  Lot sizing and scheduling -- Survey and extensions , 1997 .

[8]  S. G. Ponnambalam,et al.  A GA-SA Multiobjective Hybrid Search Algorithm for Integrating Lot Sizing and Sequencing in Flow-Line Scheduling , 2003 .

[9]  Alf Kimms,et al.  Multi-level, single-machine lot sizing and scheduling (with initial inventory) , 1996 .

[10]  G. Fontan,et al.  MIP-BASED HEURISTICS FOR CAPACITATED LOTSIZING PROBLEMS , 2003 .

[11]  Herbert Meyr,et al.  The general lotsizing and scheduling problem , 1997 .

[12]  Stéphane Dauzère-Pérès,et al.  Integration of lotsizing and scheduling decisions in a job-shop , 1994 .

[13]  M. Mohammadi,et al.  A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequence-dependent setups , 2010 .

[14]  John M. Wilson,et al.  The capacitated lot sizing problem: a review of models and algorithms , 2003 .

[15]  Harvey M. Wagner,et al.  Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..

[16]  Rakesh Nagi,et al.  Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups , 1997 .

[17]  Mohammad Mohammadi,et al.  Integrating lotsizing, loading, and scheduling decisions in flexible flow shops , 2010 .

[18]  Michael J. Shaw,et al.  Integrating the lot-sizing and sequencing decisions for scheduling a capacitated flow line , 1996 .

[19]  A. Clark,et al.  Rolling-horizon lot-sizing when set-up times are sequence-dependent , 2000 .

[20]  Günter Fandel,et al.  Simultaneous lot sizing and scheduling for multi-product multi-level production , 2006 .

[21]  Michael J. Shaw,et al.  A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes , 1997, IEEE Trans. Syst. Man Cybern. Part B.

[22]  J. Lasserre An Integrated Model for Job-Shop Planning and Scheduling , 1992 .

[23]  D. Klabjan,et al.  Single machine multi-product capacitated lot sizing with sequence-dependent setups , 2007 .

[24]  Hartmut Stadtler,et al.  Supply Chain Management and Advanced Planning: Concepts, Models, Software, and Case Studies , 2010 .

[25]  Christos T. Maravelias,et al.  Integration of production planning and scheduling: Overview, challenges and opportunities , 2009, Comput. Chem. Eng..

[26]  Alf Kimms,et al.  Lot Sizing and Scheduling with Sequence Dependent Setup Costs and Times and Efficient Rescheduling O , 2000 .