An Approach to Schedule Production using the Reservation Tables
暂无分享,去创建一个
[1] Katsuhiko Takahashi,et al. A Modified Multi-Agent System for Simple Assembly Line Balancing , 2012 .
[2] Nuchsara Kriengkorakot,et al. The Assembly Line Balancing Problem : Review articles * , 2012 .
[3] Mohammad Kamal Uddin,et al. Assembly Line Balancing and Sequencing , 2011 .
[4] Nooh Abu Bakar,et al. Solving Assembly Line Balancing Problem using Genetic Algorithm with Heuristics- Treated Initial Population , 2008 .
[5] Nils Boysen,et al. Assembly line balancing: Which model to use when? , 2006 .
[6] Stephen C. Graves,et al. A Review of Production Scheduling , 1981, Oper. Res..
[7] Nils Boysen,et al. A classification of assembly line balancing problems , 2007, Eur. J. Oper. Res..
[8] David A. Patterson,et al. Computer Architecture: A Quantitative Approach , 1969 .
[9] Jürgen Sauer. Knowledge-Based Systems Techniques and Applications in Scheduling , 1999 .
[10] Nils Boysen,et al. The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics , 2013 .
[11] Peter M. Kogge,et al. The Architecture of Pipelined Computers , 1981 .
[12] Jerzy Jozefczyk,et al. Knowledge-Based Intelligent System Advancements: Systemic and Cybernetic Approaches , 2010 .