Leakage control of multi-source water distribution system by network partition and optimal pump schedule in China

The main aim of an optimal schedule of conventional multi-source water distribution system is to reduce the energy consumption rather than minimizing the network leakage. This research is on the premise of meeting water demand, pressure and water quality considering the states of valve opening and closing, the states of pump opening and closing, and the pump speed as solution space. The optimization objectives are to minimize the network leakage and power consumptionand to find the optimal valve closing scheme for network partitioning and the optimal pump scheduling scheme. NSGA-II algorithm is employed for solving the optimization problem. The obtained network partitioning and pumping scheduling solutions are applied to a real water network in Changping town, and the results prove that this method can simultaneously reduce the power consumption and network leakage.

[1]  K. Vairavamoorthy,et al.  Leakage Reduction in Water Distribution Systems: Optimal Valve Control , 1998 .

[2]  Kalyanmoy Deb,et al.  Calibration and Optimal Leakage Management for a Real Water Distribution Network , 2011 .

[3]  Homayoun Najjaran,et al.  Evaluating leakage potential in water distribution systems: a fuzzy-based methodology , 2012 .

[4]  Nicola Fontana,et al.  Optimal Location of PRVs and Turbines in Water Distribution Systems , 2014 .

[5]  Joaquín Izquierdo,et al.  Water Supply Clusters by Multi-Agent Based Approach , 2011 .

[6]  Armando Di Nardo,et al.  A genetic algorithm for demand pattern and leakage estimation in a water distribution network , 2015 .

[7]  Alberto Campisano,et al.  Calibration of Proportional Controllers for the RTC of Pressures to Reduce Leakage in Water Distribution Networks , 2012 .

[8]  A. Criminisi,et al.  Leak Analysis in Pipeline Systems by Means of Optimal Valve Regulation , 1999 .

[9]  Orazio Giustolisi,et al.  Pressure-Driven Demand and Leakage Simulation for Water Distribution Networks , 2008 .

[10]  Bogumil Ulanicki,et al.  PRESSURE CONTROL IN DISTRICT METERING AREAS WITH BOUNDARY AND INTERNAL PRESSURE REDUCING VALVES , 2009 .

[11]  Lin Ma,et al.  Optimized Group Replacement Scheduling for Water Pipeline Network , 2016 .

[12]  Bogumil Ulanicki,et al.  Pump schedules optimisation with pressure aspects in complex large-scale water distribution systems , 2014 .

[13]  Enrico Creaco,et al.  A new algorithm for real-time pressure control in water distribution networks , 2013 .

[14]  Bogumil Ulanicki,et al.  Combined Energy and Pressure Management in Water Distribution Systems , 2009 .

[15]  Mohammed Elgorani Abdelrhman Ali Knowledge-Based Optimization Model for Control Valve Locations in Water Distribution Networks , 2015 .

[16]  Enrico Creaco,et al.  Multiobjective Optimization of Pipe Replacements and Control Valve Installations for Leakage Attenuation in Water Distribution Networks , 2015 .

[17]  Idel Montalvo,et al.  Agent-based Division of Water Distribution Systems into District Metered Areas , 2009, ICSOFT.