An evaluation of risk factors impacting construction projects in Ghana
暂无分享,去创建一个
[1] Mohan M. Kumaraswamy,et al. Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .
[2] Ayirebi Dansoh,et al. Strategic planning practice of construction firms in Ghana , 2005 .
[3] H. Odeyinka,et al. An evaluation of risk factors impacting construction cash flow forecast , 2008 .
[4] J. Gill,et al. Research Methods For Managers , 1991 .
[5] Paul. Olomolaiye,et al. Critical success criteria for mass house building projects in developing countries , 2008 .
[6] Mundia Muya,et al. Risk identification on community‐based construction projects in Zambia , 2008 .
[7] A. Dainty,et al. Health and safety management in developing countries: a study of construction SMEs in Ghana , 2008 .
[8] Nishani Harinarain,et al. Managing risks associated with the JBCC (principal building agreement) from the South African contractor's perspective , 2009 .
[9] Lubka Tchankova,et al. Risk identification – basic stage in risk management , 2002 .
[10] Cipriano Forza,et al. Survey research in operations management: a process‐based perspective , 2002 .
[11] A. Akintoye,et al. The allocation of risk in PPP/PFI construction projects in the UK , 2005 .
[12] H. Toutanji,et al. Failure Analysis of FRP-Strengthened RC Beams , 2008 .
[13] Martin Morgan Tuuli,et al. Assessment and enforcement of liquidated and ascertained damages in construction contracts in Ghana , 2007 .
[14] Anthony Mills,et al. A systematic approach to risk management for construction , 2001 .
[15] Lynn Crawford,et al. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .
[16] Joseph H. M. Tah,et al. Information modelling for a construction project risk management system , 2000 .
[17] M. Dulaimi,et al. Risk management framework for construction projects in developing countries , 2004 .
[18] Ahmad Anuar Othman,et al. Factors influencing the construction time of civil engineering projects in Malaysia , 2006 .
[19] Robert L. K. Tiong,et al. Perceptions of Singapore construction contractors on construction risk identification , 2008 .
[20] Amr A. G. Hassanein,et al. Risk management practices of contractors: A case study of power station projects in Egypt , 2007 .
[21] George O. Assibey-Mensah. Ghana's Construction Industry and Global Competition , 2009 .
[22] Francis Kofi Adams. The management of risks in international infrastructural projects , 2004 .
[23] Denis Thuillier,et al. The success of international development projects, trust and communication: an African perspective , 2005 .
[24] Raufdeen Rameezdeen,et al. Construction linkages in a developing economy: the case of Sri Lanka , 2008 .
[25] Stephen O. Ogunlana,et al. Assessment of risks in high rise building construction in Jakarta , 2003 .
[26] J. Nunnally. Psychometric Theory (2nd ed), New York: McGraw-Hill. , 1978 .
[27] Peter Edwards,et al. Risk and risk management in construction: a review and future directions for research , 1998 .
[28] Godwin Onajite Jagboro,et al. An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry , 2007 .
[29] R. Sitgreaves. Psychometric theory (2nd ed.). , 1979 .
[30] A. Akintoye,et al. Risk analysis and management in construction , 1997 .
[31] R. Garland. The Mid-Point on a Rating Scale: Is it Desirable? , 1991 .
[32] K. T. Odusami,et al. The impact of contractors' management capability on cost and time performance of construction projects in Nigeria , 2009 .
[33] Nicholas Chileshe. The application of TQM within small and medium sized construction related organisations , 2004 .
[34] Francis K. Adams. Risk perception and Bayesian analysis of international construction contract risks: The case of payment delays in a developing economy , 2008 .
[35] George Ofori. Construction technology development: role of an appropriate policy , 1994 .
[36] Eric Verzuh,et al. The Fast Forward MBA in Project Management , 1999 .