Loading procedure to transfer an Electrical Network Data Base from DIgSILENT PowerFactory to CAPE

The aim of this article is to describe a procedure to automatically and massively load the data base (DB) of Aided Protection Engineering (CAPE) program from the DB of DIgSILENT PowerFactory program. The DIgSILENT program is used by National Control Center (NCC) to make the planning and operation process of National Interconnected Colombian System (NICS).